1Bibliographic record
- Authors
- Ilija V. Djekic, Dragan Zivanovic, Sladjana Dragojlovic, Radoslava Dragovic
- Year
- 2014
- Venue
- Organizacija
- Country
- Serbia
- Segment
- Sugar and confectionery
- Process family
- Whole plant or unspecified
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 3 plants · 9 lines · — machines
- Observation period
- 730 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Company 'case study' is a leading confectionery producer in Serbia with annual production of more than 25,000 t.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
reduced speed and minor stoppageShow verbatim quote (Section 3.2)Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%. | Not classifiable from the report | Share of lost time | 13.7 % | Adjudicated |
defectsShow verbatim quote (Section 3.2)Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%. | Process defects (scrap and rework) | Share of lost time | 19.9 % | Both extractors agreed |
set-up and failuresShow verbatim quote (Section 3.2)Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%. | Not classifiable from the report | Share of lost time | 66.4 % | Adjudicated |
—Show verbatim quote (Table 3 (Q4/2012))OVERALL 87.9% 87.4% 84.3% 84.1% 80.6% 84.5% 87.8% 92.3% | none | OEE | 92.3 % | Both extractors agreed |
—Show verbatim quote (Table 3 (Q1/2011))Production line 1 85.2% 87.9% 83.2% 81.6% 82.5% 83.6% 89.7% 91.1% | none | OEE | 85.2 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 1 225.3 228.7 1.5% | none | Time between events | 225 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 1 85.2% 87.9% 83.2% 81.6% 82.5% 83.6% 89.7% 91.1% | none | OEE | 91.1 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 1 225.3 228.7 1.5% | none | Time between events | 229 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 2 90.4% 86.8% 82.7% 88.8% 86.4% 92.3% 92.6% 93.6% | none | OEE | 90.4 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 2 114.8 155.0 35.0% | none | Time between events | 115 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 2 90.4% 86.8% 82.7% 88.8% 86.4% 92.3% 92.6% 93.6% | none | OEE | 93.6 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 2 114.8 155.0 35.0% | none | Time between events | 155 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 3 89.9% 81.1% 84.9% 72.1% 58.0% 75.2% 83.6% 85.6% | none | OEE | 89.9 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 3 55.9 60.9 8.8% | none | Time between events | 55.9 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 3 89.9% 81.1% 84.9% 72.1% 58.0% 75.2% 83.6% 85.6% | none | OEE | 85.6 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 3 55.9 60.9 8.8% | none | Time between events | 60.9 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 4 87.9% 85.6% 78.4% 75.2% 68.7% 76.6% 77.5% 86.1% | none | OEE | 87.9 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 4 319.8 312.9 -2.1% | none | Time between events | 320 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 4 87.9% 85.6% 78.4% 75.2% 68.7% 76.6% 77.5% 86.1% | none | OEE | 86.1 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 4 319.8 312.9 -2.1% | none | Time between events | 313 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 5 87.6% 84.2% 80.8% 86.1% 80.5% 81.7% 87.7% 95.3% | none | OEE | 87.6 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 5 50.6 82.0 61.9% | none | Time between events | 50.6 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 5 87.6% 84.2% 80.8% 86.1% 80.5% 81.7% 87.7% 95.3% | none | OEE | 95.3 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 5 50.6 82.0 61.9% | none | Time between events | 82.0 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 6 90.2% 90.6% 87.5% 85.8% 83.7% 89.9% 90.7% 96.1% | none | OEE | 90.2 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 6 156.0 170.3 9.2% | none | Time between events | 156 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 6 90.2% 90.6% 87.5% 85.8% 83.7% 89.9% 90.7% 96.1% | none | OEE | 96.1 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 6 156.0 170.3 9.2% | none | Time between events | 170 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 7 85.1% 86.6% 85.1% 85.8% 83.2% 84.4% 83.1% 87.5% | none | OEE | 85.1 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 7 55.1 59.5 7.9% | none | Time between events | 55.1 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 7 85.1% 86.6% 85.1% 85.8% 83.2% 84.4% 83.1% 87.5% | none | OEE | 87.5 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 7 55.1 59.5 7.9% | none | Time between events | 59.5 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 8 88.1% 90.1% 85.6% 91.1% 93.6% 92.6% 94.6% 98.3% | none | OEE | 88.1 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 8 204.6 241.8 18.2% | none | Time between events | 205 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 8 88.1% 90.1% 85.6% 91.1% 93.6% 92.6% 94.6% 98.3% | none | OEE | 98.3 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 8 204.6 241.8 18.2% | none | Time between events | 242 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))Production line 9 86.9% 93.6% 90.8% 90.2% 88.5% 84.0% 90.5% 96.7% | none | OEE | 86.9 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2011))Production line 9 66.3 70.9 6.9% | none | Time between events | 66.3 h | Single extractor |
—Show verbatim quote (Table 3 (Q4/2012))Production line 9 86.9% 93.6% 90.8% 90.2% 88.5% 84.0% 90.5% 96.7% | none | OEE | 96.7 % | Single extractor |
—Show verbatim quote (Table 6 (Average MTBF in 2012))Production line 9 66.3 70.9 6.9% | none | Time between events | 70.9 h | Single extractor |
—Show verbatim quote (Table 3 (Q1/2011))OVERALL 87.9% 87.4% 84.3% 84.1% 80.6% 84.5% 87.8% 92.3% | none | OEE | 87.9 % | Single extractor |
minor problemsShow verbatim quote (Section 4.1, page 5)a total of 2284 minor problems had been recorded, with over 95% of issues revealed in due time | Idling and minor stops (micro-stops) | Number of events | 2,284 events | Single extractor |
SMED (changeover) time reductionShow verbatim quote (Section 4.3, page 6)Latest fine-tuning in 2012 decreased SMED time for 7.6% or 3473 minutes | Setup and adjustments | Share of lost time | 7.60 % | Single extractor |
visual control improvement memos fully implementedShow verbatim quote (Section 4.1, page 5)During the observed period visual control tables initiated 61 improvement memos out of which 39% were fully implemented | Organizational or external stops (material or personnel shortage, utilities outage) | Share of loss events | 39.0 % | Single extractor |
problem solving sessions effectivenessShow verbatim quote (Section 4.4, page 6)A total of 19 problem solving sessions with an average of two meeting per session were initiated with 58% of solving effectiveness | Organizational or external stops (material or personnel shortage, utilities outage) | Share of loss events | 58.0 % | Single extractor |
Observation units
- Production line 9 · Whole line or unspecified equipment · Baseline
- Overall (9 production lines) · Whole line or unspecified equipment · After intervention
- Production line 1 · Whole line or unspecified equipment · Baseline
- Production line 1 · Whole line or unspecified equipment · After intervention
- Production line 2 · Whole line or unspecified equipment · Baseline
- Production line 2 · Whole line or unspecified equipment · After intervention
- Production line 3 · Whole line or unspecified equipment · Baseline
- Production line 3 · Whole line or unspecified equipment · After intervention
- Production line 4 · Whole line or unspecified equipment · Baseline
- Production line 4 · Whole line or unspecified equipment · After intervention
- Production line 5 · Whole line or unspecified equipment · Baseline
- Production line 5 · Whole line or unspecified equipment · After intervention
- Production line 6 · Whole line or unspecified equipment · Baseline
- Production line 6 · Whole line or unspecified equipment · After intervention
- Production line 7 · Whole line or unspecified equipment · Baseline
- Production line 7 · Whole line or unspecified equipment · After intervention
- Production line 8 · Whole line or unspecified equipment · Baseline
- Production line 8 · Whole line or unspecified equipment · After intervention
- Production line 9 · Whole line or unspecified equipment · After intervention
- Overall (9 production lines) · Whole line or unspecified equipment · Baseline
- Overall plant · Whole line or unspecified equipment · After intervention