Lean Manufacturing Effects in a Serbian Confectionery Company – Case Study

Open source

1Bibliographic record

Authors
Ilija V. Djekic, Dragan Zivanovic, Sladjana Dragojlovic, Radoslava Dragovic
Year
2014
Venue
Organizacija
Country
Serbia
Segment
Sugar and confectionery
Process family
Whole plant or unspecified
Study type
Before/after intervention
Extraction scope
Full text
Size
3 plants · 9 lines · — machines
Observation period
730 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Company 'case study' is a leading confectionery producer in Serbia with annual production of more than 25,000 t.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
reduced speed and minor stoppage
Show verbatim quote (Section 3.2)
Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%.
Not classifiable from the reportShare of lost time13.7 %Adjudicated
defects
Show verbatim quote (Section 3.2)
Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%.
Process defects (scrap and rework)Share of lost time19.9 %Both extractors agreed
set-up and failures
Show verbatim quote (Section 3.2)
Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%.
Not classifiable from the reportShare of lost time66.4 %Adjudicated
—
Show verbatim quote (Table 3 (Q4/2012))
OVERALL 87.9% 87.4% 84.3% 84.1% 80.6% 84.5% 87.8% 92.3%
noneOEE92.3 %Both extractors agreed
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 1 85.2% 87.9% 83.2% 81.6% 82.5% 83.6% 89.7% 91.1%
noneOEE85.2 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 1 225.3 228.7 1.5%
noneTime between events225 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 1 85.2% 87.9% 83.2% 81.6% 82.5% 83.6% 89.7% 91.1%
noneOEE91.1 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 1 225.3 228.7 1.5%
noneTime between events229 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 2 90.4% 86.8% 82.7% 88.8% 86.4% 92.3% 92.6% 93.6%
noneOEE90.4 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 2 114.8 155.0 35.0%
noneTime between events115 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 2 90.4% 86.8% 82.7% 88.8% 86.4% 92.3% 92.6% 93.6%
noneOEE93.6 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 2 114.8 155.0 35.0%
noneTime between events155 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 3 89.9% 81.1% 84.9% 72.1% 58.0% 75.2% 83.6% 85.6%
noneOEE89.9 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 3 55.9 60.9 8.8%
noneTime between events55.9 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 3 89.9% 81.1% 84.9% 72.1% 58.0% 75.2% 83.6% 85.6%
noneOEE85.6 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 3 55.9 60.9 8.8%
noneTime between events60.9 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 4 87.9% 85.6% 78.4% 75.2% 68.7% 76.6% 77.5% 86.1%
noneOEE87.9 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 4 319.8 312.9 -2.1%
noneTime between events320 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 4 87.9% 85.6% 78.4% 75.2% 68.7% 76.6% 77.5% 86.1%
noneOEE86.1 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 4 319.8 312.9 -2.1%
noneTime between events313 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 5 87.6% 84.2% 80.8% 86.1% 80.5% 81.7% 87.7% 95.3%
noneOEE87.6 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 5 50.6 82.0 61.9%
noneTime between events50.6 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 5 87.6% 84.2% 80.8% 86.1% 80.5% 81.7% 87.7% 95.3%
noneOEE95.3 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 5 50.6 82.0 61.9%
noneTime between events82.0 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 6 90.2% 90.6% 87.5% 85.8% 83.7% 89.9% 90.7% 96.1%
noneOEE90.2 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 6 156.0 170.3 9.2%
noneTime between events156 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 6 90.2% 90.6% 87.5% 85.8% 83.7% 89.9% 90.7% 96.1%
noneOEE96.1 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 6 156.0 170.3 9.2%
noneTime between events170 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 7 85.1% 86.6% 85.1% 85.8% 83.2% 84.4% 83.1% 87.5%
noneOEE85.1 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 7 55.1 59.5 7.9%
noneTime between events55.1 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 7 85.1% 86.6% 85.1% 85.8% 83.2% 84.4% 83.1% 87.5%
noneOEE87.5 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 7 55.1 59.5 7.9%
noneTime between events59.5 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 8 88.1% 90.1% 85.6% 91.1% 93.6% 92.6% 94.6% 98.3%
noneOEE88.1 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 8 204.6 241.8 18.2%
noneTime between events205 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 8 88.1% 90.1% 85.6% 91.1% 93.6% 92.6% 94.6% 98.3%
noneOEE98.3 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 8 204.6 241.8 18.2%
noneTime between events242 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
Production line 9 86.9% 93.6% 90.8% 90.2% 88.5% 84.0% 90.5% 96.7%
noneOEE86.9 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2011))
Production line 9 66.3 70.9 6.9%
noneTime between events66.3 hSingle extractor
—
Show verbatim quote (Table 3 (Q4/2012))
Production line 9 86.9% 93.6% 90.8% 90.2% 88.5% 84.0% 90.5% 96.7%
noneOEE96.7 %Single extractor
—
Show verbatim quote (Table 6 (Average MTBF in 2012))
Production line 9 66.3 70.9 6.9%
noneTime between events70.9 hSingle extractor
—
Show verbatim quote (Table 3 (Q1/2011))
OVERALL 87.9% 87.4% 84.3% 84.1% 80.6% 84.5% 87.8% 92.3%
noneOEE87.9 %Single extractor
minor problems
Show verbatim quote (Section 4.1, page 5)
a total of 2284 minor problems had been recorded, with over 95% of issues revealed in due time
Idling and minor stops (micro-stops)Number of events2,284 eventsSingle extractor
SMED (changeover) time reduction
Show verbatim quote (Section 4.3, page 6)
Latest fine-tuning in 2012 decreased SMED time for 7.6% or 3473 minutes
Setup and adjustmentsShare of lost time7.60 %Single extractor
visual control improvement memos fully implemented
Show verbatim quote (Section 4.1, page 5)
During the observed period visual control tables initiated 61 improvement memos out of which 39% were fully implemented
Organizational or external stops (material or personnel shortage, utilities outage)Share of loss events39.0 %Single extractor
problem solving sessions effectiveness
Show verbatim quote (Section 4.4, page 6)
A total of 19 problem solving sessions with an average of two meeting per session were initiated with 58% of solving effectiveness
Organizational or external stops (material or personnel shortage, utilities outage)Share of loss events58.0 %Single extractor

Observation units

  • Production line 9 · Whole line or unspecified equipment · Baseline
  • Overall (9 production lines) · Whole line or unspecified equipment · After intervention
  • Production line 1 · Whole line or unspecified equipment · Baseline
  • Production line 1 · Whole line or unspecified equipment · After intervention
  • Production line 2 · Whole line or unspecified equipment · Baseline
  • Production line 2 · Whole line or unspecified equipment · After intervention
  • Production line 3 · Whole line or unspecified equipment · Baseline
  • Production line 3 · Whole line or unspecified equipment · After intervention
  • Production line 4 · Whole line or unspecified equipment · Baseline
  • Production line 4 · Whole line or unspecified equipment · After intervention
  • Production line 5 · Whole line or unspecified equipment · Baseline
  • Production line 5 · Whole line or unspecified equipment · After intervention
  • Production line 6 · Whole line or unspecified equipment · Baseline
  • Production line 6 · Whole line or unspecified equipment · After intervention
  • Production line 7 · Whole line or unspecified equipment · Baseline
  • Production line 7 · Whole line or unspecified equipment · After intervention
  • Production line 8 · Whole line or unspecified equipment · Baseline
  • Production line 8 · Whole line or unspecified equipment · After intervention
  • Production line 9 · Whole line or unspecified equipment · After intervention
  • Overall (9 production lines) · Whole line or unspecified equipment · Baseline
  • Overall plant · Whole line or unspecified equipment · After intervention