Process defects (scrap and rework)

Unspecified packaging defect

In short

It appears in about 2 of every 100 lines studied.

When it appears, it takes on average about 47 % of the line's lost time. Reported by 5 of the 112 studies that could observe it (good evidence).

What happens

Finished packs fail to meet quality specifications at first pass due to an unidentified fault in the packaging machine or process, such as improper sealing, wrapping, labeling alignment or pack integrity, without the primary record specifying the exact failure mode.

What is done about it

Investigate the packaging line to identify and document the specific defect mode, then apply targeted corrective actions such as sealing parameter adjustment, mechanical inspection, operator training or sensor-based detection to prevent recurrence.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.6% [0.5–3.7%]
Expected share of lost time
0.8% [0.2–1.8%]
Share of lost time when present
47% [36–57%]
Studies / units
112 / 155
Evidence grade
B

Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.7% [0.3–5.1%]14 studies
  • Soft drinks, bottled water and juices
    1.3% [0.2–3.4%]33 studies
  • Brewing, wine and spirits
    1.6% [0.2–4.7%]14 studies
  • Bakery and pasta
    1.8% [0.2–6.1%]6 studies
  • Meat, poultry and seafood
    1.8% [0.3–5.7%]6 studies
  • Fruit and vegetable processing
    1.8% [0.3–5.9%]4 studies
  • Grain and oilseed milling
    1.8% [0.3–5.9%]4 studies
  • Sugar and confectionery
    1.8% [0.3–6.2%]4 studies
  • Snacks, coffee, tea and other foods
    3.3% [0.6–9.6%]8 studies
  • Animal feed and pet food
    1.8% [0.3–5.8%]5 studies
  • Food manufacturing (unspecified or mixed)
    4.2% [0.9–11.8%]14 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Finished packs fail to meet quality specifications at first pass due to an unidentified fault in the packaging machine or process, such as improper sealing, wrapping, labeling alignment or pack integrity, without the primary record specifying the exact failure mode.

How it looks in SCADA data

Engineering guidance

MES/SCADA records show rejected or downgraded units counted at the packaging station output, often tagged generically as defect or reject without a specific fault code, while machine running states remain normal with no associated unplanned stop.

Countermeasure

Engineering guidance

Investigate the packaging line to identify and document the specific defect mode, then apply targeted corrective actions such as sealing parameter adjustment, mechanical inspection, operator training or sensor-based detection to prevent recurrence.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of planned time: 0.0700 % · as reported: “Defect Losses”
    Show verbatim quote
    Rata-rata 2779,69 0,0025 941,77 0,07
  2. Share of lost time: 5.48 % · as reported: “Scrap”
    Show verbatim quote
    Scrap 5.48% 5.71% 5.28%
  3. Share of lost time: 5.28 % · as reported: “Scrap”
    Show verbatim quote
    Scrap 5.48% 5.71% 5.28%
  4. Share of planned time: 0.420 % · as reported: “Defect”
    Show verbatim quote
    5 Defect 0,42 1,34 100,00
  5. Share of lost time: 1.34 % · as reported: “Defect”
    Show verbatim quote
    5 Defect 0,42 1,34 100,00
  6. Defect rate: 2.00 % · as reported: “refugo por defeito”
    Show verbatim quote
    Observou-se que na etapa de empacotamento, houve refugo por defeito de 5 kg de café (2%) e paradas para ajustes na máquina de 4 minutos e 29 segundos.
  7. Share of lost time: 22.0 % · as reported: “Defect Losses”
    Show verbatim quote
    Defect Losses 8.890 37.985 22% 94%
  8. Lost time: 8,890 Minutes · as reported: “Defect Losses”
    Show verbatim quote
    Defect Losses 8.890 37.985 22% 94%
  9. Share of lost time: 9.58 % · as reported: “Process Defect Losses”
    Show verbatim quote
    Kegagalan karena Process Defect Losses 25,28 9,58 Sedang
  10. Lost time: 25.3 Jam · as reported: “Process Defect Losses”
    Show verbatim quote
    Kegagalan karena Process Defect Losses 25,28 9,58 Sedang
  11. Share of lost time: 6.00 % · as reported: “Production defect loss”
    Show verbatim quote
    Production defect loss 6