foratvise
Get Started
Included study

Penerapan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT. Surya Tsabat Mandiri

Open source

1Bibliographic record

Authors
Rizqi Wahyudi, Rafi Gredita Ferdana, Andhyka Tyaz Nugraha
Year
2023
Venue
Jurnal Optimalisasi
Country
Indonesia
Segment
Bakery and pasta
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · 5 machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Dalam menunjang produksinya, divisi packaging memiliki 5 (lima) unit mesin packing.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—mesin packing
Show verbatim quote (Table 2)
Rata- rata nilai OEE 78,17%
noneOEE78.2 %Both extractors agreed
Idling stop and minor stoppagesmesin packing
Show verbatim quote (Table 3)
1 Idling stop and minor stoppages 16,85 53,58 53,58
Idling and minor stops (micro-stops)Share of planned time16.9 %Both extractors agreed
Setup and adjustmentmesin packing
Show verbatim quote (Table 3)
3 Setup and adjustment 5,06 16,09 94,63
Setup and adjustmentsShare of planned time5.06 %Both extractors agreed
Reduced speedmesin packing
Show verbatim quote (Table 3)
2 Reduced speed 7,85 24,96 78,54
Reduced speedShare of planned time7.85 %Both extractors agreed
Breakdownmesin packing
Show verbatim quote (Table 3)
4 Breakdown 1,27 4,04 98,66
Equipment failure (breakdowns)Share of planned time1.27 %Both extractors agreed
Defectmesin packing
Show verbatim quote (Table 3)
5 Defect 0,42 1,34 100,00
Process defects (scrap and rework)Share of planned time0.420 %Both extractors agreed
—mesin packing
Show verbatim quote (Table 2)
1 Maret 2021 95,5% 81,9% 99,5% 77,82%
noneAvailability95.5 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
1 Maret 2021 95,5% 81,9% 99,5% 77,82%
nonePerformance81.9 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
1 Maret 2021 95,5% 81,9% 99,5% 77,82%
noneQuality99.5 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
2 Mei 2021 83,2% 74,3% 99,7% 61,63%
noneAvailability83.2 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
2 Mei 2021 83,2% 74,3% 99,7% 61,63%
nonePerformance74.3 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
2 Mei 2021 83,2% 74,3% 99,7% 61,63%
noneQuality99.7 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
3 Juni 2021 95,0% 88,3% 99,4% 83,38%
noneAvailability95.0 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
3 Juni 2021 95,0% 88,3% 99,4% 83,38%
nonePerformance88.3 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
3 Juni 2021 95,0% 88,3% 99,4% 83,38%
noneQuality99.4 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
4 Juli 2021 94,6% 82,5% 99,4% 77,58%
noneAvailability94.6 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
4 Juli 2021 94,6% 82,5% 99,4% 77,58%
nonePerformance82.5 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
5 Agustus 2021 94,5% 81,8% 99,4% 76,84%
noneAvailability94.5 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
5 Agustus 2021 94,5% 81,8% 99,4% 76,84%
nonePerformance81.8 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
6 September 2021 94,6% 87,1% 99,4% 81,90%
nonePerformance87.1 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
7 Oktober 2021 94,5% 85,4% 99,5% 80,30%
nonePerformance85.4 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
8 November 2021 94,3% 87,6% 99,6% 82,28%
noneAvailability94.3 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
8 November 2021 94,3% 87,6% 99,6% 82,28%
nonePerformance87.6 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
8 November 2021 94,3% 87,6% 99,6% 82,28%
noneQuality99.6 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
9 Desember 2021 94,3% 85,0% 99,5% 79,75%
nonePerformance85.0 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
10 Januari 2022 94,6% 84,0% 99,6% 79,15%
nonePerformance84.0 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
11 Februari 2022 94,1% 84,5% 99,6% 79,20%
noneAvailability94.1 %Single extractor
—mesin packing
Show verbatim quote (Table 2)
11 Februari 2022 94,1% 84,5% 99,6% 79,20%
nonePerformance84.5 %Single extractor
Idling stop and minor stoppagesmesin packing
Show verbatim quote (Table 3)
1 Idling stop and minor stoppages 16,85 53,58 53,58
Idling and minor stops (micro-stops)Share of lost time53.6 %Single extractor
Reduced speedmesin packing
Show verbatim quote (Table 3)
2 Reduced speed 7,85 24,96 78,54
Reduced speedShare of lost time25.0 %Single extractor
Setup and adjustmentmesin packing
Show verbatim quote (Table 3)
3 Setup and adjustment 5,06 16,09 94,63
Setup and adjustmentsShare of lost time16.1 %Single extractor
Breakdownmesin packing
Show verbatim quote (Table 3)
4 Breakdown 1,27 4,04 98,66
Equipment failure (breakdowns)Share of lost time4.04 %Single extractor
Defectmesin packing
Show verbatim quote (Table 3)
5 Defect 0,42 1,34 100,00
Process defects (scrap and rework)Share of lost time1.34 %Single extractor

Observation units

  • Mesin Packing · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline