Enhancing Production Efficiency and Quality in the Carbonated Beverage Industry: A Lean Manufacturing Approach

Open source

1Bibliographic record

Authors
Bianca Joyce Vargas-Romero, Borys Gastón Urbizagastegui-Jaramillo, Martin Fidel Collao-Diaz
Year
2024
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
180 days
Data collection
not_reported
Intervention
Show the setting as described by the study
The implementation of this model in a Peruvian beverage manufacturing facility led to notable improvements

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—filling machines
Show verbatim quote (Table 1. Validation results)
OEE (%) 61% 81% 32.79%
noneOEE81.0 %Both extractors agreed
—filling machines
Show verbatim quote (Table 1. Validation results)
OEE (%) 61% 81% 32.79%
noneOEE61.0 %Both extractors agreed
Wasted labelslabeling
Show verbatim quote (Table 1. Validation results)
Wasted labels (labels/month) 780 330 -57.69%
Process defects (scrap and rework)Number of events330 labels/monthBoth extractors agreed
Wasted labelslabeling
Show verbatim quote (Table 1. Validation results)
Wasted labels (labels/month) 780 330 -57.69%
Process defects (scrap and rework)Number of events780 labels/monthBoth extractors agreed
Defective bottles
Show verbatim quote (Table 1. Validation results)
Defective bottles (unit) 172 61 -64.53%
Process defects (scrap and rework)Number of events61.0 unitsBoth extractors agreed
Defective bottles
Show verbatim quote (Table 1. Validation results)
Defective bottles (unit) 172 61 -64.53%
Process defects (scrap and rework)Number of events172 unitsBoth extractors agreed
Number of machines stopsfilling machines
Show verbatim quote (Table 1. Validation results)
Number of machines stops 32 21 -34.38%
Not classifiable from the reportNumber of events21.0 eventsAdjudicated
Downtime machinesfilling machines
Show verbatim quote (Table 1. Validation results)
Downtime machines (min) 185 95 -48.65%
Not classifiable from the reportLost time95.0 minBoth extractors agreed
Number of machines stopsfilling machines
Show verbatim quote (Table 1. Validation results)
Number of machines stops 32 21 -34.38%
Not classifiable from the reportNumber of events32.0 eventsAdjudicated
Downtime machinesfilling machines
Show verbatim quote (Table 1. Validation results)
Downtime machines (min) 185 95 -48.65%
Not classifiable from the reportLost time185 minBoth extractors agreed
Bags wasted
Show verbatim quote (Table 1. Validation results)
Bags wasted (units) 83 56 -32.53%
Process defects (scrap and rework)Number of events56.0 unitsBoth extractors agreed
Bags wasted
Show verbatim quote (Table 1. Validation results)
Bags wasted (units) 83 56 -32.53%
Process defects (scrap and rework)Number of events83.0 unitsBoth extractors agreed
Lotting cycle timegrouping station
Show verbatim quote (Table 1. Validation results)
Lotting cycle time (min) 21.2 18.4 -13.21%
Reduced speedMean event duration21.2 minSingle extractor
Spraying cycle timespraying station
Show verbatim quote (Table 1. Validation results)
Sprying cicle time (min) 6.5 3.9 -40.00%
Reduced speedMean event duration6.50 minSingle extractor
Lotting cycle timegrouping station
Show verbatim quote (Table 1. Validation results)
Lotting cycle time (min) 21.2 18.4 -13.21%
Reduced speedMean event duration18.4 minSingle extractor
Spraying cycle timespraying station
Show verbatim quote (Table 1. Validation results)
Sprying cicle time (min) 6.5 3.9 -40.00%
Reduced speedMean event duration3.90 minSingle extractor

Observation units

  • Beverage bottling line · Whole line or unspecified equipment · After intervention
  • Beverage bottling line · Whole line or unspecified equipment · Baseline