Included study
Enhancing Production Efficiency and Quality in the Carbonated Beverage Industry: A Lean Manufacturing Approach
1Bibliographic record
- Authors
- Bianca Joyce Vargas-Romero, Borys Gastón Urbizagastegui-Jaramillo, Martin Fidel Collao-Diaz
- Year
- 2024
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 180 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
The implementation of this model in a Peruvian beverage manufacturing facility led to notable improvements
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—filling machinesShow verbatim quote (Table 1. Validation results)OEE (%) 61% 81% 32.79% | none | OEE | 81.0 % | Both extractors agreed |
—filling machinesShow verbatim quote (Table 1. Validation results)OEE (%) 61% 81% 32.79% | none | OEE | 61.0 % | Both extractors agreed |
Wasted labelslabelingShow verbatim quote (Table 1. Validation results)Wasted labels (labels/month) 780 330 -57.69% | Process defects (scrap and rework) | Number of events | 330 labels/month | Both extractors agreed |
Wasted labelslabelingShow verbatim quote (Table 1. Validation results)Wasted labels (labels/month) 780 330 -57.69% | Process defects (scrap and rework) | Number of events | 780 labels/month | Both extractors agreed |
Defective bottlesShow verbatim quote (Table 1. Validation results)Defective bottles (unit) 172 61 -64.53% | Process defects (scrap and rework) | Number of events | 61.0 units | Both extractors agreed |
Defective bottlesShow verbatim quote (Table 1. Validation results)Defective bottles (unit) 172 61 -64.53% | Process defects (scrap and rework) | Number of events | 172 units | Both extractors agreed |
Number of machines stopsfilling machinesShow verbatim quote (Table 1. Validation results)Number of machines stops 32 21 -34.38% | Not classifiable from the report | Number of events | 21.0 events | Adjudicated |
Downtime machinesfilling machinesShow verbatim quote (Table 1. Validation results)Downtime machines (min) 185 95 -48.65% | Not classifiable from the report | Lost time | 95.0 min | Both extractors agreed |
Number of machines stopsfilling machinesShow verbatim quote (Table 1. Validation results)Number of machines stops 32 21 -34.38% | Not classifiable from the report | Number of events | 32.0 events | Adjudicated |
Downtime machinesfilling machinesShow verbatim quote (Table 1. Validation results)Downtime machines (min) 185 95 -48.65% | Not classifiable from the report | Lost time | 185 min | Both extractors agreed |
Bags wastedShow verbatim quote (Table 1. Validation results)Bags wasted (units) 83 56 -32.53% | Process defects (scrap and rework) | Number of events | 56.0 units | Both extractors agreed |
Bags wastedShow verbatim quote (Table 1. Validation results)Bags wasted (units) 83 56 -32.53% | Process defects (scrap and rework) | Number of events | 83.0 units | Both extractors agreed |
Lotting cycle timegrouping stationShow verbatim quote (Table 1. Validation results)Lotting cycle time (min) 21.2 18.4 -13.21% | Reduced speed | Mean event duration | 21.2 min | Single extractor |
Spraying cycle timespraying stationShow verbatim quote (Table 1. Validation results)Sprying cicle time (min) 6.5 3.9 -40.00% | Reduced speed | Mean event duration | 6.50 min | Single extractor |
Lotting cycle timegrouping stationShow verbatim quote (Table 1. Validation results)Lotting cycle time (min) 21.2 18.4 -13.21% | Reduced speed | Mean event duration | 18.4 min | Single extractor |
Spraying cycle timespraying stationShow verbatim quote (Table 1. Validation results)Sprying cicle time (min) 6.5 3.9 -40.00% | Reduced speed | Mean event duration | 3.90 min | Single extractor |
Observation units
- Beverage bottling line · Whole line or unspecified equipment · After intervention
- Beverage bottling line · Whole line or unspecified equipment · Baseline