Included study
Lean-TPM Production Model for Efficiency and Quality Enhancement in the Brewing Industry: Insights from a Peruvian Case Study
1Bibliographic record
- Authors
- Jofre Alfredo Cerna-Arribasplata, Andre Moises Rivas-Atauchi, Elmer Luis Tupia De La Cruz
- Year
- 2025
- Venue
- International Journal of Recent Engineering Science
- Country
- Peru
- Segment
- Brewing, wine and spirits
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 120 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
This company specializes in the production of canned beer, focusing on two main product presentations, 355 ml and 473 ml.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Section 4.4 Results)The defective product rate showed a remarkable improvement of 56%, reducing from 2.97% to 1.30%, confirming the positive impact of the model on final product quality. | Process defects (scrap and rework) | Defect rate | 1.30 % | Both extractors agreed |
—Show verbatim quote (Section 4.4 Results)The defective product rate showed a remarkable improvement of 56%, reducing from 2.97% to 1.30%, confirming the positive impact of the model on final product quality. | Process defects (scrap and rework) | Defect rate | 2.97 % | Both extractors agreed |
downtimeShow verbatim quote (Section 4.4 Results)Likewise, downtime decreased by 72%, dropping from 74 to 21 minutes, demonstrating greater operational availability of the equipment. | Not classifiable from the report | Lost time | 21.0 min | Both extractors agreed |
downtimeShow verbatim quote (Section 4.4 Results)Likewise, downtime decreased by 72%, dropping from 74 to 21 minutes, demonstrating greater operational availability of the equipment. | Not classifiable from the report | Lost time | 74.0 min | Both extractors agreed |
setup timeShow verbatim quote (Section 4.4 Results)Setup time experienced a notable improvement, decreasing by 29%, from 41 to 29 minutes, reflecting substantial optimization in process efficiency. | Setup and adjustments | Mean event duration | 41.0 min | Single extractor |
rework caused by errors in the sealing processShow verbatim quote (Section 4.2 Initial Diagnosis)This inefficiency was attributed to three main factors: rework, accounting for 13.95% of the issue, was caused by errors in the sealing process. | Process defects (scrap and rework) | Share of lost time | 14.0 % | Single extractor |
errors in operational developmentShow verbatim quote (Section 4.2 Initial Diagnosis)Errors in operational development, representing 39.20%, were linked to two root causes: cans failing to meet the required filling level, highlighting the need for systems such as Andon, and technical machinery failures, which accounted for 27.01% | Not classifiable from the report | Share of lost time | 39.2 % | Single extractor |
technical machinery failuresShow verbatim quote (Section 4.2 Initial Diagnosis)technical machinery failures, which accounted for 27.01% and could be mitigated through autonomous maintenance based on 5S principles within a TPM framework. | Equipment failure (breakdowns) | Share of lost time | 27.0 % | Single extractor |
process stoppages due to machineryShow verbatim quote (Section 4.2 Initial Diagnosis)Lastly, process stoppages due to machinery were the most significant factor, with an impact of 46.85%, stemming from extended equipment setup times, which represented 19.84%, suggesting the implementation of the SMED methodology to reduce these delays. | Not classifiable from the report | Share of lost time | 46.9 % | Single extractor |
extended equipment setup timesShow verbatim quote (Section 4.2 Initial Diagnosis)Lastly, process stoppages due to machinery were the most significant factor, with an impact of 46.85%, stemming from extended equipment setup times, which represented 19.84%, suggesting the implementation of the SMED methodology to reduce these delays. | Setup and adjustments | Share of lost time | 19.8 % | Single extractor |
setup timeShow verbatim quote (Section 4.4 Results)Setup time experienced a notable improvement, decreasing by 29%, from 41 to 29 minutes, reflecting substantial optimization in process efficiency. | Setup and adjustments | Mean event duration | 29.0 min | Single extractor |
—Show verbatim quote (Section 4.4)Setup time experienced a notable improvement, decreasing by 29%, from 41 to 29 minutes, reflecting substantial optimization in process efficiency. | Setup and adjustments | Lost time | 41.0 min | Single extractor |
—Show verbatim quote (Section 4.4)Setup time experienced a notable improvement, decreasing by 29%, from 41 to 29 minutes, reflecting substantial optimization in process efficiency. | Setup and adjustments | Lost time | 29.0 min | Single extractor |
Observation units
- Canning line · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention
- Canning line · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline