Included study
Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance
1Bibliographic record
- Authors
- Pengfei Zeng, Weiping Shao, Yongping Hao
- Year
- 2021
- Venue
- Tehnicki vjesnik - Technical Gazette
- Country
- China
- Segment
- Brewing, wine and spirits
- Process family
- Filling and packaging line
- Study type
- Reliability analysis
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 9 machines
- Observation period
- 365 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
This paper takes filling production line of bottled beer as the research object from a certain Chinese beer production enterprise.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Share of planned time | 2.44 % | Both extractors agreed |
—Show verbatim quote (Section 5.3 / Table 3)Tab. 3 shows that MTBF is equal to 1212.46 min, and mean monthly failure frequency is 15.08, in the beer filling production line. | Equipment failure (breakdowns) | Time between events | 1,212 min | Both extractors agreed |
—Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 181 events | Both extractors agreed |
—Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 5,485 min | Both extractors agreed |
PM2Palletizing Machine (PM2)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 220 min | Both extractors agreed |
DMDepalletizing Machine (DM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 240 min | Both extractors agreed |
PM1Packing Machine (PM1)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 225 min | Both extractors agreed |
UMUnpacking Machine (UM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 265 min | Both extractors agreed |
LMLabeling Machine (LM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 450 min | Both extractors agreed |
BWMBottle Washing Machine (BWM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 560 min | Both extractors agreed |
SMSterilization Machine (SM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 500 min | Both extractors agreed |
BIMBottle Inspection Machine (BIM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 485 min | Both extractors agreed |
BFMBeer Filling Machine (BFM)Show verbatim quote (Section 5.3)its MTBF is 3597.62 min, and mean monthly failure frequency is 5.08. | Equipment failure (breakdowns) | Time between events | 3,598 min | Both extractors agreed |
BFMBeer Filling Machine (BFM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 61.0 events | Both extractors agreed |
BFMBeer Filling Machine (BFM)Show verbatim quote (Table 1)Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44% | Equipment failure (breakdowns) | Lost time | 2,540 min | Both extractors agreed |
—Show verbatim quote (Table 3, month 1)1 864.76 26.67 0.970 | Equipment failure (breakdowns) | Mean event duration | 26.7 min | Single extractor |
—Show verbatim quote (Table 3, month 2)2 1403.21 36.79 0.974 | Equipment failure (breakdowns) | Mean event duration | 36.8 min | Single extractor |
—Show verbatim quote (Table 3, month 3)3 986.76 29.71 0.971 | Equipment failure (breakdowns) | Mean event duration | 29.7 min | Single extractor |
—Show verbatim quote (Table 3, month 4)4 926.67 27.62 0.971 | Equipment failure (breakdowns) | Mean event duration | 27.6 min | Single extractor |
—Show verbatim quote (Table 3, month 5)5 1378.21 27.50 0.980 | Equipment failure (breakdowns) | Mean event duration | 27.5 min | Single extractor |
—Show verbatim quote (Table 3, month 6)6 1444.23 32.69 0.978 | Equipment failure (breakdowns) | Mean event duration | 32.7 min | Single extractor |
—Show verbatim quote (Table 3, month 7)7 1309.23 33.85 0.975 | Equipment failure (breakdowns) | Mean event duration | 33.9 min | Single extractor |
—Show verbatim quote (Table 3, month 8)8 1234.23 30.38 0.976 | Equipment failure (breakdowns) | Mean event duration | 30.4 min | Single extractor |
—Show verbatim quote (Table 3, month 9)9 1153.44 31.56 0.973 | Equipment failure (breakdowns) | Mean event duration | 31.6 min | Single extractor |
—Show verbatim quote (Table 3, month 10)10 1585.00 35.00 0.978 | Equipment failure (breakdowns) | Mean event duration | 35.0 min | Single extractor |
—Show verbatim quote (Table 3, month 11)11 1308.57 28.57 0.979 | Equipment failure (breakdowns) | Mean event duration | 28.6 min | Single extractor |
—Show verbatim quote (Table 3, month 12)12 1421.92 27.31 0.981 | Equipment failure (breakdowns) | Mean event duration | 27.3 min | Single extractor |
—Show verbatim quote (Table 3, month 1)1 864.76 26.67 0.970 | none | Availability | 0.970 ratio | Single extractor |
—Show verbatim quote (Table 3, month 2)2 1403.21 36.79 0.974 | none | Availability | 0.974 ratio | Single extractor |
—Show verbatim quote (Table 3, month 3)3 986.76 29.71 0.971 | none | Availability | 0.971 ratio | Single extractor |
—Show verbatim quote (Table 3, month 5)5 1378.21 27.50 0.980 | none | Availability | 0.980 ratio | Single extractor |
—Show verbatim quote (Table 3, month 6)6 1444.23 32.69 0.978 | none | Availability | 0.978 ratio | Single extractor |
—Show verbatim quote (Table 3, month 7)7 1309.23 33.85 0.975 | none | Availability | 0.975 ratio | Single extractor |
—Show verbatim quote (Table 3, month 8)8 1234.23 30.38 0.976 | none | Availability | 0.976 ratio | Single extractor |
—Show verbatim quote (Table 3, month 9)9 1153.44 31.56 0.973 | none | Availability | 0.973 ratio | Single extractor |
—Show verbatim quote (Table 3, month 11)11 1308.57 28.57 0.979 | none | Availability | 0.979 ratio | Single extractor |
—Show verbatim quote (Table 3, month 12)12 1421.92 27.31 0.981 | none | Availability | 0.981 ratio | Single extractor |
BIMBottle Inspection Machine (BIM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 21.0 events | Single extractor |
SMSterilization Machine (SM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 24.0 events | Single extractor |
BWMBottle Washing Machine (BWM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 22.0 events | Single extractor |
LMLabeling Machine (LM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 17.0 events | Single extractor |
UMUnpacking Machine (UM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 7.00 events | Single extractor |
PM1Packing Machine (PM1)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 11.0 events | Single extractor |
DMDepalletizing Machine (DM)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 10.0 events | Single extractor |
PM2Palletizing Machine (PM2)Show verbatim quote (Table 2)Total 61 21 24 22 17 7 11 10 8 181 | Equipment failure (breakdowns) | Number of events | 8.00 events | Single extractor |
Observation units
- Beer filling production line (whole line) · Whole line or unspecified equipment · Baseline
- PM2 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- DM · Conveying and accumulation · Baseline
- PM1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- UM · Conveying and accumulation · Baseline
- LM · Labeling and coding · Baseline
- BWM · Container washing and rinsing · Baseline
- SM · Sterilization (retort, UHT) · Baseline
- BIM · Inspection and checkweighing · Baseline
- BFM · Filling · Baseline