foratvise
Get Started
Included study

Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance

Open source

1Bibliographic record

Authors
Pengfei Zeng, Weiping Shao, Yongping Hao
Year
2021
Venue
Tehnicki vjesnik - Technical Gazette
Country
China
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Reliability analysis
Extraction scope
Full text
Size
1 plants · 1 lines · 9 machines
Observation period
365 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
This paper takes filling production line of bottled beer as the research object from a certain Chinese beer production enterprise.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Share of planned time2.44 %Both extractors agreed
—
Show verbatim quote (Section 5.3 / Table 3)
Tab. 3 shows that MTBF is equal to 1212.46 min, and mean monthly failure frequency is 15.08, in the beer filling production line.
Equipment failure (breakdowns)Time between events1,212 minBoth extractors agreed
—
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events181 eventsBoth extractors agreed
—
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time5,485 minBoth extractors agreed
PM2Palletizing Machine (PM2)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time220 minBoth extractors agreed
DMDepalletizing Machine (DM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time240 minBoth extractors agreed
PM1Packing Machine (PM1)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time225 minBoth extractors agreed
UMUnpacking Machine (UM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time265 minBoth extractors agreed
LMLabeling Machine (LM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time450 minBoth extractors agreed
BWMBottle Washing Machine (BWM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time560 minBoth extractors agreed
SMSterilization Machine (SM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time500 minBoth extractors agreed
BIMBottle Inspection Machine (BIM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time485 minBoth extractors agreed
BFMBeer Filling Machine (BFM)
Show verbatim quote (Section 5.3)
its MTBF is 3597.62 min, and mean monthly failure frequency is 5.08.
Equipment failure (breakdowns)Time between events3,598 minBoth extractors agreed
BFMBeer Filling Machine (BFM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events61.0 eventsBoth extractors agreed
BFMBeer Filling Machine (BFM)
Show verbatim quote (Table 1)
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
Equipment failure (breakdowns)Lost time2,540 minBoth extractors agreed
—
Show verbatim quote (Table 3, month 1)
1 864.76 26.67 0.970
Equipment failure (breakdowns)Mean event duration26.7 minSingle extractor
—
Show verbatim quote (Table 3, month 2)
2 1403.21 36.79 0.974
Equipment failure (breakdowns)Mean event duration36.8 minSingle extractor
—
Show verbatim quote (Table 3, month 3)
3 986.76 29.71 0.971
Equipment failure (breakdowns)Mean event duration29.7 minSingle extractor
—
Show verbatim quote (Table 3, month 4)
4 926.67 27.62 0.971
Equipment failure (breakdowns)Mean event duration27.6 minSingle extractor
—
Show verbatim quote (Table 3, month 5)
5 1378.21 27.50 0.980
Equipment failure (breakdowns)Mean event duration27.5 minSingle extractor
—
Show verbatim quote (Table 3, month 6)
6 1444.23 32.69 0.978
Equipment failure (breakdowns)Mean event duration32.7 minSingle extractor
—
Show verbatim quote (Table 3, month 7)
7 1309.23 33.85 0.975
Equipment failure (breakdowns)Mean event duration33.9 minSingle extractor
—
Show verbatim quote (Table 3, month 8)
8 1234.23 30.38 0.976
Equipment failure (breakdowns)Mean event duration30.4 minSingle extractor
—
Show verbatim quote (Table 3, month 9)
9 1153.44 31.56 0.973
Equipment failure (breakdowns)Mean event duration31.6 minSingle extractor
—
Show verbatim quote (Table 3, month 10)
10 1585.00 35.00 0.978
Equipment failure (breakdowns)Mean event duration35.0 minSingle extractor
—
Show verbatim quote (Table 3, month 11)
11 1308.57 28.57 0.979
Equipment failure (breakdowns)Mean event duration28.6 minSingle extractor
—
Show verbatim quote (Table 3, month 12)
12 1421.92 27.31 0.981
Equipment failure (breakdowns)Mean event duration27.3 minSingle extractor
—
Show verbatim quote (Table 3, month 1)
1 864.76 26.67 0.970
noneAvailability0.970 ratioSingle extractor
—
Show verbatim quote (Table 3, month 2)
2 1403.21 36.79 0.974
noneAvailability0.974 ratioSingle extractor
—
Show verbatim quote (Table 3, month 3)
3 986.76 29.71 0.971
noneAvailability0.971 ratioSingle extractor
—
Show verbatim quote (Table 3, month 5)
5 1378.21 27.50 0.980
noneAvailability0.980 ratioSingle extractor
—
Show verbatim quote (Table 3, month 6)
6 1444.23 32.69 0.978
noneAvailability0.978 ratioSingle extractor
—
Show verbatim quote (Table 3, month 7)
7 1309.23 33.85 0.975
noneAvailability0.975 ratioSingle extractor
—
Show verbatim quote (Table 3, month 8)
8 1234.23 30.38 0.976
noneAvailability0.976 ratioSingle extractor
—
Show verbatim quote (Table 3, month 9)
9 1153.44 31.56 0.973
noneAvailability0.973 ratioSingle extractor
—
Show verbatim quote (Table 3, month 11)
11 1308.57 28.57 0.979
noneAvailability0.979 ratioSingle extractor
—
Show verbatim quote (Table 3, month 12)
12 1421.92 27.31 0.981
noneAvailability0.981 ratioSingle extractor
BIMBottle Inspection Machine (BIM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events21.0 eventsSingle extractor
SMSterilization Machine (SM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events24.0 eventsSingle extractor
BWMBottle Washing Machine (BWM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events22.0 eventsSingle extractor
LMLabeling Machine (LM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events17.0 eventsSingle extractor
UMUnpacking Machine (UM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events7.00 eventsSingle extractor
PM1Packing Machine (PM1)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events11.0 eventsSingle extractor
DMDepalletizing Machine (DM)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events10.0 eventsSingle extractor
PM2Palletizing Machine (PM2)
Show verbatim quote (Table 2)
Total 61 21 24 22 17 7 11 10 8 181
Equipment failure (breakdowns)Number of events8.00 eventsSingle extractor

Observation units

  • Beer filling production line (whole line) · Whole line or unspecified equipment · Baseline
  • PM2 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • DM · Conveying and accumulation · Baseline
  • PM1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • UM · Conveying and accumulation · Baseline
  • LM · Labeling and coding · Baseline
  • BWM · Container washing and rinsing · Baseline
  • SM · Sterilization (retort, UHT) · Baseline
  • BIM · Inspection and checkweighing · Baseline
  • BFM · Filling · Baseline