foratvise
Get Started
Included study

Revitalising the setup reduction activities in Operations Management

Open source

1Bibliographic record

Authors
Diego Augusto de Jesús Pacheco, Giovana Di Giorgio Heidrich
Year
2021
Venue
Production Planning & Control
Country
Brazil
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 4 machines
Observation period
549 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The beverage company where the research was conducted has been operating in Brazil since 2013 with roughly 70 employees and a plant capacity of 50.000 hectoliters/month covering three bottling production lines, according to the type of products.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
nonePerformance99.9 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
noneQuality99.7 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
noneAvailability94.8 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 6)
Consequently, the OEE ratio of the labelling machine was improved by 33.8% (1-62.4/94.3), as displayed in Fig. 6.
noneOEE94.3 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 6)
Consequently, the OEE ratio of the labelling machine was improved by 33.8% (1-62.4/94.3), as displayed in Fig. 6.
noneOEE62.4 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 5)
The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7).
noneQuality93.2 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 5)
The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7).
nonePerformance87.2 %Both extractors agreed
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 5)
The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7).
noneAvailability76.8 %Both extractors agreed
—
Show verbatim quote (Section 4.2 / Fig. 7)
The data collection outcomes (Fig. 7) showed that the line’s OEE obtained an actual improvement of approximately 17% (1-72.3/87.5).
noneOEE87.5 %Both extractors agreed
—
Show verbatim quote (Section 4.2 / Fig. 7)
The data collection outcomes (Fig. 7) showed that the line’s OEE obtained an actual improvement of approximately 17% (1-72.3/87.5).
noneOEE72.3 %Both extractors agreed
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneAvailability71.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneAvailability68.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneAvailability72.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneAvailability79.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneAvailability74.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
nonePerformance26.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
nonePerformance30.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
nonePerformance20.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
nonePerformance24.0 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneQuality3.00 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneQuality2.00 %Single extractor
—
Show verbatim quote (Table 2)
Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2%
noneQuality1.00 %Single extractor
setup losses
Show verbatim quote (Section 3.1 / Fig. 3)
Considering the same period of time analysed, the setup losses constitute 107.5 hours and the setting losses approximately 93.2 hours.
Setup and adjustmentsLost time108 hSingle extractor
setting losses
Show verbatim quote (Section 3.1 / Fig. 3)
Considering the same period of time analysed, the setup losses constitute 107.5 hours and the setting losses approximately 93.2 hours.
Setup and adjustmentsLost time93.2 hSingle extractor
setup operation
Show verbatim quote (Section 4.2)
Before the intervention, the time to conclude a setup operation was approximately 156 minutes. After the intervention, it was reduced to approximately 104 minutes.
Setup and adjustmentsMean event duration156 minSingle extractor
—
Show verbatim quote (Section 4.2)
Considering that the production line performs an average of 8 setups operations per month and that the productive capacity of the labelling machine is, on average, 7.000 units/hour
Setup and adjustmentsNumber of events8.00 events/monthSingle extractor
—
Show verbatim quote (Section 4.3)
The size of the production lots for the manufactured products of the line (510 ml bottles and 1.500 ml bottles with/without gas) before the intervention was on average 161.450 units/month
noneThroughput161,450 units/monthSingle extractor
setup operation
Show verbatim quote (Section 4.2)
Before the intervention, the time to conclude a setup operation was approximately 156 minutes. After the intervention, it was reduced to approximately 104 minutes.
Setup and adjustmentsMean event duration104 minSingle extractor
—
Show verbatim quote (Section 4.3)
while after the intervention and stabilisation of the new work processes implemented, the outcomes achieved a more economical production of small batch sizes, decreased to an average of 89.512 units/month
noneThroughput89,512 units/monthSingle extractor
Setup timeLabelling machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Setup and adjustmentsMean event duration148 minSingle extractor
Idle timeLabelling machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Idling and minor stops (micro-stops)Mean event duration0 minSingle extractor
equipment setupLabelling machine
Show verbatim quote (Section 4.1 / Fig. 4)
In short, our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes (Fig. 4).
Setup and adjustmentsMean event duration148 minSingle extractor
equipment setupLabelling machine
Show verbatim quote (Section 4.1 / Fig. 4)
In short, our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes (Fig. 4).
Setup and adjustmentsMean event duration19.0 minSingle extractor
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 5)
The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7).
noneAvailability94.8 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 5)
The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7).
nonePerformance99.9 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2 / Fig. 5)
The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7).
noneQuality99.7 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
noneAvailability94.7 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
noneAvailability94.7 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
noneQuality99.6 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
noneQuality99.6 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
nonePerformance99.8 %Single extractor
—Labelling machine
Show verbatim quote (Section 4.2)
These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%).
nonePerformance99.9 %Single extractor
Setup timeBlowing machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Setup and adjustmentsMean event duration85.0 minSingle extractor
Idle timeBlowing machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Idling and minor stops (micro-stops)Mean event duration57.0 minSingle extractor
Setup timeFilling machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Setup and adjustmentsMean event duration69.0 minSingle extractor
Idle timeFilling machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Idling and minor stops (micro-stops)Mean event duration73.0 minSingle extractor
Setup timePackaging machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Setup and adjustmentsMean event duration97.0 minSingle extractor
Idle timePackaging machine
Show verbatim quote (Table 3)
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
Idling and minor stops (micro-stops)Mean event duration51.0 minSingle extractor
—labelling machine
Show verbatim quote (Page 18, Table 3 and text)
The observations revealed that the labelling machine is the equipment with the longest setup time in the line, totalling 156 (148 + 8) minutes.
Setup and adjustmentsLost time148 minSingle extractor
—labelling machine
Show verbatim quote (Page 26)
our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes
Setup and adjustmentsLost time19.0 minSingle extractor

Observation units

  • Labelling machine · Labeling and coding · After intervention
  • Labelling machine · Labeling and coding · Baseline
  • Production line 3 · Whole line or unspecified equipment · After intervention
  • Production line 3 · Whole line or unspecified equipment · Baseline
  • Blowing machine · Forming, moulding and depositing · Baseline
  • Filling machine · Filling · Baseline
  • Packaging machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline