1Bibliographic record
- Authors
- Diego Augusto de Jesús Pacheco, Giovana Di Giorgio Heidrich
- Year
- 2021
- Venue
- Production Planning & Control
- Country
- Brazil
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 4 machines
- Observation period
- 549 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The beverage company where the research was conducted has been operating in Brazil since 2013 with roughly 70 employees and a plant capacity of 50.000 hectoliters/month covering three bottling production lines, according to the type of products.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Performance | 99.9 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Quality | 99.7 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Availability | 94.8 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 6)Consequently, the OEE ratio of the labelling machine was improved by 33.8% (1-62.4/94.3), as displayed in Fig. 6. | none | OEE | 94.3 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 6)Consequently, the OEE ratio of the labelling machine was improved by 33.8% (1-62.4/94.3), as displayed in Fig. 6. | none | OEE | 62.4 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 5)The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7). | none | Quality | 93.2 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 5)The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7). | none | Performance | 87.2 % | Both extractors agreed |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 5)The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7). | none | Availability | 76.8 % | Both extractors agreed |
—Show verbatim quote (Section 4.2 / Fig. 7)The data collection outcomes (Fig. 7) showed that the line’s OEE obtained an actual improvement of approximately 17% (1-72.3/87.5). | none | OEE | 87.5 % | Both extractors agreed |
—Show verbatim quote (Section 4.2 / Fig. 7)The data collection outcomes (Fig. 7) showed that the line’s OEE obtained an actual improvement of approximately 17% (1-72.3/87.5). | none | OEE | 72.3 % | Both extractors agreed |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Availability | 71.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Availability | 68.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Availability | 72.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Availability | 79.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Availability | 74.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Performance | 26.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Performance | 30.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Performance | 20.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Performance | 24.0 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Quality | 3.00 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Quality | 2.00 % | Single extractor |
—Show verbatim quote (Table 2)Indicator Jul. Aug. Sept. Oct. Nov. Dec. Availability 71% 68% 72% 79% 74% 72% Performance 26% 30% 26% 20% 24% 26% Quality 3% 2% 2% 1% 2% 2% | none | Quality | 1.00 % | Single extractor |
setup lossesShow verbatim quote (Section 3.1 / Fig. 3)Considering the same period of time analysed, the setup losses constitute 107.5 hours and the setting losses approximately 93.2 hours. | Setup and adjustments | Lost time | 108 h | Single extractor |
setting lossesShow verbatim quote (Section 3.1 / Fig. 3)Considering the same period of time analysed, the setup losses constitute 107.5 hours and the setting losses approximately 93.2 hours. | Setup and adjustments | Lost time | 93.2 h | Single extractor |
setup operationShow verbatim quote (Section 4.2)Before the intervention, the time to conclude a setup operation was approximately 156 minutes. After the intervention, it was reduced to approximately 104 minutes. | Setup and adjustments | Mean event duration | 156 min | Single extractor |
—Show verbatim quote (Section 4.2)Considering that the production line performs an average of 8 setups operations per month and that the productive capacity of the labelling machine is, on average, 7.000 units/hour | Setup and adjustments | Number of events | 8.00 events/month | Single extractor |
—Show verbatim quote (Section 4.3)The size of the production lots for the manufactured products of the line (510 ml bottles and 1.500 ml bottles with/without gas) before the intervention was on average 161.450 units/month | none | Throughput | 161,450 units/month | Single extractor |
setup operationShow verbatim quote (Section 4.2)Before the intervention, the time to conclude a setup operation was approximately 156 minutes. After the intervention, it was reduced to approximately 104 minutes. | Setup and adjustments | Mean event duration | 104 min | Single extractor |
—Show verbatim quote (Section 4.3)while after the intervention and stabilisation of the new work processes implemented, the outcomes achieved a more economical production of small batch sizes, decreased to an average of 89.512 units/month | none | Throughput | 89,512 units/month | Single extractor |
Setup timeLabelling machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Setup and adjustments | Mean event duration | 148 min | Single extractor |
Idle timeLabelling machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Idling and minor stops (micro-stops) | Mean event duration | 0 min | Single extractor |
equipment setupLabelling machineShow verbatim quote (Section 4.1 / Fig. 4)In short, our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes (Fig. 4). | Setup and adjustments | Mean event duration | 148 min | Single extractor |
equipment setupLabelling machineShow verbatim quote (Section 4.1 / Fig. 4)In short, our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes (Fig. 4). | Setup and adjustments | Mean event duration | 19.0 min | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 5)The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7). | none | Availability | 94.8 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 5)The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7). | none | Performance | 99.9 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2 / Fig. 5)The outcome analysis showed improvements in Availability rate of approximately 19% (1-76.8/94.8), Performance of 12.7% (1-87.2/99.9) and Quality of 6.5% (1-93.2/99.7). | none | Quality | 99.7 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Availability | 94.7 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Availability | 94.7 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Quality | 99.6 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Quality | 99.6 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Performance | 99.8 % | Single extractor |
—Labelling machineShow verbatim quote (Section 4.2)These values are: Availability (Jul/16: 94.68%; Aug/2016: 94.72%; Sep/2016: 94.77%), Quality (Jul/16: 99.57%; Aug/2016: 99.60%; Sep/2016: 99.65%) and Performance (Jul/16: 99.80%; Aug/2016: 99.85%; Sep/2016: 99.87%). | none | Performance | 99.9 % | Single extractor |
Setup timeBlowing machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Setup and adjustments | Mean event duration | 85.0 min | Single extractor |
Idle timeBlowing machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Idling and minor stops (micro-stops) | Mean event duration | 57.0 min | Single extractor |
Setup timeFilling machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Setup and adjustments | Mean event duration | 69.0 min | Single extractor |
Idle timeFilling machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Idling and minor stops (micro-stops) | Mean event duration | 73.0 min | Single extractor |
Setup timePackaging machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Setup and adjustments | Mean event duration | 97.0 min | Single extractor |
Idle timePackaging machineShow verbatim quote (Table 3)Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes | Idling and minor stops (micro-stops) | Mean event duration | 51.0 min | Single extractor |
—labelling machineShow verbatim quote (Page 18, Table 3 and text)The observations revealed that the labelling machine is the equipment with the longest setup time in the line, totalling 156 (148 + 8) minutes. | Setup and adjustments | Lost time | 148 min | Single extractor |
—labelling machineShow verbatim quote (Page 26)our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes | Setup and adjustments | Lost time | 19.0 min | Single extractor |
Observation units
- Labelling machine · Labeling and coding · After intervention
- Labelling machine · Labeling and coding · Baseline
- Production line 3 · Whole line or unspecified equipment · After intervention
- Production line 3 · Whole line or unspecified equipment · Baseline
- Blowing machine · Forming, moulding and depositing · Baseline
- Filling machine · Filling · Baseline
- Packaging machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline