Included study
A SEMINAR PAPER ON “OVERALL EQUIPMENT EFFECTIVENESS: A CASE STUDY AT A BOTTLING PLANT”
1Bibliographic record
- Authors
- Khem Raj Pokhrel
- Year
- 2023
- Venue
- International Journal of Engineering Applied Sciences and Technology
- Country
- Nepal
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 10 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
a case study on a production line of VBNPL, one of the reputed beverage companies in Nepal working as the franchise of the international brand “PepsiCo. Int”, is done.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—FillerShow verbatim quote (Section V.B Discussion)Since only 97.97% of the quality rate is obtained from the calculation. | none | Quality | 98.0 % | Both extractors agreed |
—FillerShow verbatim quote (Section VI Conclusion)the OEE of the filler section is computed which is obtained as 61.8% which is comparatively less. | none | OEE | 61.8 % | Both extractors agreed |
Bottle obstruted on spiral drivespiral driveShow verbatim quote (Table-7)7 Bottle obstruted on spiral drive 2 61 100% | Idling and minor stops (micro-stops) | Number of events | 2.00 events | Both extractors agreed |
Crown path obstructedcrownerShow verbatim quote (Table-7)5 Crown path obstructed 3 57 93% | Idling and minor stops (micro-stops) | Number of events | 3.00 events | Both extractors agreed |
Bottle shortageShow verbatim quote (Table-7)4 Bottle shortage 5 54 89% | Organizational or external stops (material or personnel shortage, utilities outage) | Number of events | 5.00 events | Both extractors agreed |
Bottle fallingconveyorShow verbatim quote (Table-7)1 Bottle falling 21 21 34% | Idling and minor stops (micro-stops) | Number of events | 21.0 events | Both extractors agreed |
Looses vent tubevent tubeShow verbatim quote (Table-7)2 Looses vent tube 16 37 61% | Equipment failure (breakdowns) | Number of events | 16.0 events | Both extractors agreed |
Bottle jamconveyorShow verbatim quote (Table-7)6 Bottle jam 2 59 97% | Idling and minor stops (micro-stops) | Number of events | 2.00 events | Both extractors agreed |
Reject BottlesFillerShow verbatim quote (Table-6)105334 2134 8 1.5 0.62 385 | Process defects (scrap and rework) | Number of events | 2,134 bottles | Single extractor |
—FillerShow verbatim quote (Table-6)105334 2134 8 1.5 0.62 385 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 1.50 hrs | Single extractor |
—FillerShow verbatim quote (Table-6)105334 2134 8 1.5 0.62 385 | Equipment failure (breakdowns) | Lost time | 0.620 hrs | Single extractor |
Reject BottlesFillerShow verbatim quote (Table-6)88883 2483 8 2 0.83 385 | Process defects (scrap and rework) | Number of events | 2,483 bottles | Single extractor |
—FillerShow verbatim quote (Table-6)88883 2483 8 2 0.83 385 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 2.00 hrs | Single extractor |
—FillerShow verbatim quote (Table-6)88883 2483 8 2 0.83 385 | Equipment failure (breakdowns) | Lost time | 0.830 hrs | Single extractor |
Reject BottlesFillerShow verbatim quote (Table-6)93559 2359 8 0.75 0.75 385 | Process defects (scrap and rework) | Number of events | 2,359 bottles | Single extractor |
—FillerShow verbatim quote (Table-6)93559 2359 8 0.75 0.75 385 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 0.750 hrs | Single extractor |
—FillerShow verbatim quote (Table-6)93559 2359 8 0.75 0.75 385 | Equipment failure (breakdowns) | Lost time | 0.750 hrs | Single extractor |
Observation units
- Filler · Filling · Baseline