A SEMINAR PAPER ON “OVERALL EQUIPMENT EFFECTIVENESS: A CASE STUDY AT A BOTTLING PLANT”

Open source

1Bibliographic record

Authors
Khem Raj Pokhrel
Year
2023
Venue
International Journal of Engineering Applied Sciences and Technology
Country
Nepal
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
10 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
a case study on a production line of VBNPL, one of the reputed beverage companies in Nepal working as the franchise of the international brand “PepsiCo. Int”, is done.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Filler
Show verbatim quote (Section V.B Discussion)
Since only 97.97% of the quality rate is obtained from the calculation.
noneQuality98.0 %Both extractors agreed
—Filler
Show verbatim quote (Section VI Conclusion)
the OEE of the filler section is computed which is obtained as 61.8% which is comparatively less.
noneOEE61.8 %Both extractors agreed
Bottle obstruted on spiral drivespiral drive
Show verbatim quote (Table-7)
7 Bottle obstruted on spiral drive 2 61 100%
Idling and minor stops (micro-stops)Number of events2.00 eventsBoth extractors agreed
Crown path obstructedcrowner
Show verbatim quote (Table-7)
5 Crown path obstructed 3 57 93%
Idling and minor stops (micro-stops)Number of events3.00 eventsBoth extractors agreed
Bottle shortage
Show verbatim quote (Table-7)
4 Bottle shortage 5 54 89%
Organizational or external stops (material or personnel shortage, utilities outage)Number of events5.00 eventsBoth extractors agreed
Bottle fallingconveyor
Show verbatim quote (Table-7)
1 Bottle falling 21 21 34%
Idling and minor stops (micro-stops)Number of events21.0 eventsBoth extractors agreed
Looses vent tubevent tube
Show verbatim quote (Table-7)
2 Looses vent tube 16 37 61%
Equipment failure (breakdowns)Number of events16.0 eventsBoth extractors agreed
Bottle jamconveyor
Show verbatim quote (Table-7)
6 Bottle jam 2 59 97%
Idling and minor stops (micro-stops)Number of events2.00 eventsBoth extractors agreed
Reject BottlesFiller
Show verbatim quote (Table-6)
105334 2134 8 1.5 0.62 385
Process defects (scrap and rework)Number of events2,134 bottlesSingle extractor
—Filler
Show verbatim quote (Table-6)
105334 2134 8 1.5 0.62 385
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1.50 hrsSingle extractor
—Filler
Show verbatim quote (Table-6)
105334 2134 8 1.5 0.62 385
Equipment failure (breakdowns)Lost time0.620 hrsSingle extractor
Reject BottlesFiller
Show verbatim quote (Table-6)
88883 2483 8 2 0.83 385
Process defects (scrap and rework)Number of events2,483 bottlesSingle extractor
—Filler
Show verbatim quote (Table-6)
88883 2483 8 2 0.83 385
Planned downtime (scheduled maintenance, breaks, no demand)Lost time2.00 hrsSingle extractor
—Filler
Show verbatim quote (Table-6)
88883 2483 8 2 0.83 385
Equipment failure (breakdowns)Lost time0.830 hrsSingle extractor
Reject BottlesFiller
Show verbatim quote (Table-6)
93559 2359 8 0.75 0.75 385
Process defects (scrap and rework)Number of events2,359 bottlesSingle extractor
—Filler
Show verbatim quote (Table-6)
93559 2359 8 0.75 0.75 385
Planned downtime (scheduled maintenance, breaks, no demand)Lost time0.750 hrsSingle extractor
—Filler
Show verbatim quote (Table-6)
93559 2359 8 0.75 0.75 385
Equipment failure (breakdowns)Lost time0.750 hrsSingle extractor

Observation units

  • Filler · Filling · Baseline