A Lean Manufacturing Case Study: Enhancing Efficiency and Reducing Waste in Latin American Food Production

Open source

1Bibliographic record

Authors
Alexandra Katherine Rojas-Valverde, Claudia Alexandra Muñoz-Briceño
Year
2024
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
Figure 1 shows the production model based on Lean Manufacturing philosophy, applied to the cookie production line.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 2)
Centerlining Quality rate of finished products 91% 95% 95.90% 5.38%
noneQuality91.0 %Both extractors agreed
—
Show verbatim quote (Table 2)
TPM Rate of performance of machines 89% 95% 95.00% 6.74%
nonePerformance89.0 %Both extractors agreed
—
Show verbatim quote (Table 2)
Centerlining Quality rate of finished products 91% 95% 95.90% 5.38%
noneQuality95.9 %Both extractors agreed
—
Show verbatim quote (Table 2)
TPM Rate of availability of machines 91% 95% 95.10% 4.51%
noneAvailability91.0 %Both extractors agreed
—
Show verbatim quote (Section 4.2, Figure 5)
In the first quarter of the following year, the OEE further increased to 86.7%.
noneOEE86.7 %Both extractors agreed
—
Show verbatim quote (Table 2)
TPM Rate of availability of machines 91% 95% 95.10% 4.51%
noneAvailability95.1 %Both extractors agreed
—
Show verbatim quote (Table 2)
TPM Rate of performance of machines 89% 95% 95.00% 6.74%
nonePerformance95.0 %Both extractors agreed
—
Show verbatim quote (Table 2)
TPM OEE 83% 95% 86.70% 4.46%
noneOEE83.0 %Both extractors agreed
Scrap rate
Show verbatim quote (Table 2)
PokaYoke Scrap rate 15% 5% 4.00% -73.33%
Process defects (scrap and rework)Defect rate15.0 %Single extractor
high rate of decline
Show verbatim quote (Section 4.1, Figure 2)
At the first level, three main reasons were identified: a high rate of decline (55%), a high rate of defective products (25%), and elevated unproductive times (20%).
Process defects (scrap and rework)Share of lost time55.0 %Single extractor
high rate of defective products
Show verbatim quote (Section 4.1, Figure 2)
At the first level, three main reasons were identified: a high rate of decline (55%), a high rate of defective products (25%), and elevated unproductive times (20%).
Process defects (scrap and rework)Share of lost time25.0 %Single extractor
elevated unproductive times
Show verbatim quote (Section 4.1, Figure 2)
At the first level, three main reasons were identified: a high rate of decline (55%), a high rate of defective products (25%), and elevated unproductive times (20%).
Equipment failure (breakdowns)Share of lost time20.0 %Single extractor
clogging of cookies in conveyor belt chutesconveyor belt chutes
Show verbatim quote (Section 4.1, Figure 2)
At the third level, the root causes were further detailed as clogging of cookies in conveyor belt chutes (55%), product fragility (13.5%), inadequate sealing of packaging (11.5%), and conveyor belt failures (20%).
Idling and minor stops (micro-stops)Share of lost time55.0 %Single extractor
product fragility
Show verbatim quote (Section 4.1, Figure 2)
At the third level, the root causes were further detailed as clogging of cookies in conveyor belt chutes (55%), product fragility (13.5%), inadequate sealing of packaging (11.5%), and conveyor belt failures (20%).
Process defects (scrap and rework)Share of lost time13.5 %Single extractor
inadequate sealing of packagingprimary packaging machine
Show verbatim quote (Section 4.1, Figure 2)
At the third level, the root causes were further detailed as clogging of cookies in conveyor belt chutes (55%), product fragility (13.5%), inadequate sealing of packaging (11.5%), and conveyor belt failures (20%).
Process defects (scrap and rework)Share of lost time11.5 %Single extractor
conveyor belt failuresconveyor belt
Show verbatim quote (Section 4.1, Figure 2)
At the third level, the root causes were further detailed as clogging of cookies in conveyor belt chutes (55%), product fragility (13.5%), inadequate sealing of packaging (11.5%), and conveyor belt failures (20%).
Equipment failure (breakdowns)Share of lost time20.0 %Single extractor
Scrap rate
Show verbatim quote (Table 2)
PokaYoke Scrap rate 15% 5% 4.00% -73.33%
Process defects (scrap and rework)Defect rate4.00 %Single extractor
—
Show verbatim quote (Section 4.2, Figure 5)
In the first quarter, the OEE was 79.6%, increasing to 83.1% in the second quarter and 83.4% in the third quarter.
noneOEE79.6 %Single extractor
—
Show verbatim quote (Section 4.2, Figure 5)
In the first quarter, the OEE was 79.6%, increasing to 83.1% in the second quarter and 83.4% in the third quarter.
noneOEE83.1 %Single extractor
—
Show verbatim quote (Section 4.2, Figure 5)
In the first quarter, the OEE was 79.6%, increasing to 83.1% in the second quarter and 83.4% in the third quarter.
noneOEE83.4 %Single extractor
—
Show verbatim quote (Section 4.2, Figure 5)
In the fourth quarter, the OEE reached 85.7%, surpassing the 85% target.
noneOEE85.7 %Single extractor
—
Show verbatim quote (page 9, section 5 Results)
Additionally, the quality rate of finished products increased from 91% to 95.90%, and the scrap rate decreased from 15% to 4.00%.
Process defects (scrap and rework)Defect rate15.0 %Single extractor
—
Show verbatim quote (page 9, section 5 Results)
Additionally, the quality rate of finished products increased from 91% to 95.90%, and the scrap rate decreased from 15% to 4.00%.
Process defects (scrap and rework)Defect rate4.00 %Single extractor

Observation units

  • Biscuit Type D production line · Whole line or unspecified equipment · Baseline
  • Biscuit Type D production line · Whole line or unspecified equipment · After intervention