foratvise
Get Started
Included study

Integrasi OEE–Pareto–FMEA–Ishikawa untuk Peningkatan Efektivitas Mesin dan Mutu Kemasan Kecap Pouch 550 mL: Integrated OEE–Pareto–FMEA–Ishikawa Approach for Improving Machine Effectiveness and Packaging Quality of 550 mL Soy Sauce Pouch

Open source

1Bibliographic record

Authors
Aditya Wahyu Winadi Atmajaya, Syaiful Bachri, Avisenna Harkat, Dyah Kusuma Wardani, Fredy Eka Ardhi Pratama
Year
2026
Venue
Jurnal Ilmiah Inovasi
DOI
—
Country
—
Segment
Snacks, coffee, tea and other foods
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
Objek penelitian adalah mesin RTY-10S Rotary Doy Pouch yang digunakan untuk mengemas kecap dalam kemasan pouch 550 mL.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Underfill
Show verbatim quote (Table 3)
Underfill 58 0,22 1,27
Process defects (scrap and rework)Number of events58.0 kasusBoth extractors agreed
Underfill
Show verbatim quote (Table 3)
Underfill 58 0,22 1,27
Process defects (scrap and rework)Share of loss events1.27 %Both extractors agreed
Underfill
Show verbatim quote (Table 3)
Underfill 58 0,22 1,27
Process defects (scrap and rework)Defect rate0.220 %Both extractors agreed
—
Show verbatim quote (Table 1)
Availability 56 90 Perlu perbaikan
noneAvailability56.0 %Both extractors agreed
—
Show verbatim quote (Table 1)
Performance 66 95 Perlu perbaikan
nonePerformance66.0 %Both extractors agreed
Exp. date tidak tercetak
Show verbatim quote (Table 3)
Exp. date tidak tercetak 66 0,25 1,45
Process defects (scrap and rework)Number of events66.0 kasusBoth extractors agreed
Seal terlipat
Show verbatim quote (Table 3)
Seal terlipat 112 0,42 2,45
Process defects (scrap and rework)Number of events112 kasusBoth extractors agreed
—
Show verbatim quote (Table 1)
Quality 83 99 Perlu perbaikan
noneQuality83.0 %Both extractors agreed
Exp. date tidak tercetak
Show verbatim quote (Table 3)
Exp. date tidak tercetak 66 0,25 1,45
Process defects (scrap and rework)Share of loss events1.45 %Both extractors agreed
Exp. date tidak tercetak
Show verbatim quote (Table 3)
Exp. date tidak tercetak 66 0,25 1,45
Process defects (scrap and rework)Defect rate0.250 %Both extractors agreed
Seal terlipat
Show verbatim quote (Table 3)
Seal terlipat 112 0,42 2,45
Process defects (scrap and rework)Share of loss events2.45 %Both extractors agreed
Seal terlipat
Show verbatim quote (Table 3)
Seal terlipat 112 0,42 2,45
Process defects (scrap and rework)Defect rate0.420 %Both extractors agreed
—
Show verbatim quote (Table 1)
OEE 30 85 Perlu perbaikan
noneOEE30.0 %Both extractors agreed
Bocor
Show verbatim quote (Table 3)
Bocor 110 0,41 2,41
Process defects (scrap and rework)Number of events110 kasusBoth extractors agreed
Startup loss
Show verbatim quote (Table 2)
Startup loss 0
Start-up losses (reduced yield)Share of lost time0 %Both extractors agreed
Production defect loss
Show verbatim quote (Table 2)
Production defect loss 6
Process defects (scrap and rework)Share of lost time6.00 %Both extractors agreed
Setup and adjustment loss
Show verbatim quote (Table 2)
Setup and adjustment loss 19
Setup and adjustmentsShare of lost time19.0 %Both extractors agreed
Small stop loss
Show verbatim quote (Table 2)
Small stop loss 20
Idling and minor stops (micro-stops)Share of lost time20.0 %Both extractors agreed
Reduced speed loss
Show verbatim quote (Table 2)
Reduced speed loss 20
Reduced speedShare of lost time20.0 %Both extractors agreed
Breakdown loss
Show verbatim quote (Table 2)
Breakdown loss 25
Equipment failure (breakdowns)Share of lost time25.0 %Both extractors agreed
—
Show verbatim quote (Section 3.3)
ditemukan 4.564 produk cacat atau 17,17% dari total produksi
Process defects (scrap and rework)Number of events4,564 pouchSingle extractor
—
Show verbatim quote (Section 3.3)
ditemukan 4.564 produk cacat atau 17,17% dari total produksi
Process defects (scrap and rework)Defect rate17.2 %Single extractor
Pouch tidak terisi
Show verbatim quote (Table 3)
Pouch tidak terisi 4.218 15,87 92,42
Process defects (scrap and rework)Number of events4,218 kasusSingle extractor
Pouch tidak terisi
Show verbatim quote (Table 3)
Pouch tidak terisi 4.218 15,87 92,42
Process defects (scrap and rework)Defect rate15.9 %Single extractor
Pouch tidak terisi
Show verbatim quote (Table 3)
Pouch tidak terisi 4.218 15,87 92,42
Process defects (scrap and rework)Share of loss events92.4 %Single extractor
Bocor
Show verbatim quote (Table 3)
Bocor 110 0,41 2,41
Process defects (scrap and rework)Defect rate0.410 %Single extractor
Bocor
Show verbatim quote (Table 3)
Bocor 110 0,41 2,41
Process defects (scrap and rework)Share of loss events2.41 %Single extractor
unfilled pouch
Show verbatim quote (Section 3.3, Table 3)
pouch tidak terisi sebanyak 4.218 kasus
Process defects (scrap and rework)Number of events4,218 unitsSingle extractor
unfilled pouch
Show verbatim quote (Section 3.3, Table 3)
pouch tidak terisi sebanyak 4.218 kasus atau 15,87% dari total produksi
Process defects (scrap and rework)Defect rate15.9 %Single extractor
unfilled pouch
Show verbatim quote (Section 3.3)
pouch tidak terisi berkontribusi sebesar 92,42%
Process defects (scrap and rework)Share of loss events92.4 %Single extractor
leak
Show verbatim quote (Table 3, Section 3.3)
Bocor | 110 | 0,41 | 2,41
Process defects (scrap and rework)Defect rate0.410 %Single extractor
leak
Show verbatim quote (Table 3, Section 3.3)
Bocor | 110 | 0,41 | 2,41
Process defects (scrap and rework)Share of loss events2.41 %Single extractor

Observation units

  • RTY-10S Rotary Doy Pouch · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • RTY-10S · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline