Aggregate Analysis of Packaging Machine Effectiveness Using the OEE Method at PT. XYZ

Open source

1Bibliographic record

Authors
Satria Bagus Aji, Siti Nurhayati Ning Rahayu, Adi Fitra, Syarah Rizkia Feriaty, Tri Ngudi Wiyatno
Year
2025
Venue
Jurnal Teknologi Terapan G-Tech
Country
Indonesia
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 10 machines
Observation period
92 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
This study aims to analyze the effectiveness of ten CBP product packaging machines at PT. XYZ using the Overall Equipment Effectiveness (OEE) method.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
imprecise timing belts, improper timing belt fit, and broken timing beltstiming belt
Show verbatim quote (Fishbone Diagram section (Machine))
These issues contribute to downtime with a total of 5663 minutes and a frequency of 1171 occurrences.
Equipment failure (breakdowns)Number of events1,171 occurrencesBoth extractors agreed
—
Show verbatim quote (Conclusion)
The Availability ratio averaged 91%, the Performance ratio 94.77%, and the Quality ratio 95%.
noneQuality95.0 %Both extractors agreed
—
Show verbatim quote (Conclusion)
The Availability ratio averaged 91%, the Performance ratio 94.77%, and the Quality ratio 95%.
nonePerformance94.8 %Both extractors agreed
—
Show verbatim quote (Conclusion)
The Availability ratio averaged 91%, the Performance ratio 94.77%, and the Quality ratio 95%.
noneAvailability91.0 %Both extractors agreed
sticky labels, jammed labels, labels too short or too long, and labels getting caughtlabel applicator
Show verbatim quote (Fishbone Diagram section (Material))
These problems have caused downtime from October to December 2023, with a total downtime of 6448 minutes and a frequency of 1595 occurrences.
Equipment failure (breakdowns)Number of events1,595 occurrencesBoth extractors agreed
—
Show verbatim quote (Conclusion)
The research results show that the average Overall Equipment Effectiveness (OEE) value of the ten CBP product packaging machines at PT. XYZ from October to December 2023 is 94%, which exceeds the world-class standard of 85%.
noneOEE94.0 %Both extractors agreed
sticky labels, jammed labels, labels too short or too long, and labels getting caughtlabel applicator
Show verbatim quote (Fishbone Diagram section (Material))
These problems have caused downtime from October to December 2023, with a total downtime of 6448 minutes and a frequency of 1595 occurrences.
Equipment failure (breakdowns)Lost time6,448 minutesBoth extractors agreed
bucket errors, RCU errors, and thermocouple cable failures caused by overheating, leading to seal leaksscale bucket / RCU / thermocouple
Show verbatim quote (Fishbone Diagram section (Man))
These issues have contributed a total of 19,425 minutes of downtime with 4524 occurrences from October to December 2023.
Equipment failure (breakdowns)Number of events4,524 occurrencesBoth extractors agreed
imprecise timing belts, improper timing belt fit, and broken timing beltstiming belt
Show verbatim quote (Fishbone Diagram section (Machine))
These issues contribute to downtime with a total of 5663 minutes and a frequency of 1171 occurrences.
Equipment failure (breakdowns)Lost time5,663 minutesBoth extractors agreed
worn knives due to prolonged use, such as broken, misaligned, or jammed knivesknife
Show verbatim quote (Fishbone Diagram section (Machine))
issues with worn knives due to prolonged use, such as broken, misaligned, or jammed knives, have caused downtime for the machines, contributing 1462 minutes of downtime and 131 occurrences.
Equipment failure (breakdowns)Number of events131 occurrencesBoth extractors agreed
worn knives due to prolonged use, such as broken, misaligned, or jammed knivesknife
Show verbatim quote (Fishbone Diagram section (Machine))
issues with worn knives due to prolonged use, such as broken, misaligned, or jammed knives, have caused downtime for the machines, contributing 1462 minutes of downtime and 131 occurrences.
Equipment failure (breakdowns)Lost time1,462 minutesBoth extractors agreed
bucket errors, RCU errors, and thermocouple cable failures caused by overheating, leading to seal leaksscale bucket / RCU / thermocouple
Show verbatim quote (Fishbone Diagram section (Man))
These issues have contributed a total of 19,425 minutes of downtime with 4524 occurrences from October to December 2023.
Equipment failure (breakdowns)Lost time19,425 minutesBoth extractors agreed
Equipment Failure Losses
Show verbatim quote (Table 8)
Equipment Failure Losses 20.205 20.205 50% 50%
Equipment failure (breakdowns)Share of lost time50.0 %Both extractors agreed
Equipment Failure Losses
Show verbatim quote (Table 8)
Equipment Failure Losses 20.205 20.205 50% 50%
Equipment failure (breakdowns)Lost time20,205 MinutesBoth extractors agreed
Setup and Adjusments Losses
Show verbatim quote (Table 8)
Setup and Adjusments Losses 2.425 40.410 6% 100%
Setup and adjustmentsShare of lost time6.00 %Both extractors agreed
Setup and Adjusments Losses
Show verbatim quote (Table 8)
Setup and Adjusments Losses 2.425 40.410 6% 100%
Setup and adjustmentsLost time2,425 MinutesBoth extractors agreed
Reduced Speed Losses
Show verbatim quote (Table 8)
Reduced Speed Losses 0 40.410 0% 100%
Reduced speedShare of lost time0 %Both extractors agreed
Reduced Speed Losses
Show verbatim quote (Table 8)
Reduced Speed Losses 0 40.410 0% 100%
Reduced speedLost time0 MinutesBoth extractors agreed
Rework Losses
Show verbatim quote (Table 8)
Rework Losses 8.890 29.095 22% 72%
Process defects (scrap and rework)Share of lost time22.0 %Both extractors agreed
Rework Losses
Show verbatim quote (Table 8)
Rework Losses 8.890 29.095 22% 72%
Process defects (scrap and rework)Lost time8,890 MinutesBoth extractors agreed
Defect Losses
Show verbatim quote (Table 8)
Defect Losses 8.890 37.985 22% 94%
Process defects (scrap and rework)Share of lost time22.0 %Both extractors agreed
Defect Losses
Show verbatim quote (Table 8)
Defect Losses 8.890 37.985 22% 94%
Process defects (scrap and rework)Lost time8,890 MinutesBoth extractors agreed
Idling and Minor Stopages Losses
Show verbatim quote (Table 8)
Idling and Minor Stopages Losses 0 40.410 0% 100%
Idling and minor stops (micro-stops)Lost time0 MinutesSingle extractor
Idling and Minor Stopages Losses
Show verbatim quote (Table 8)
Idling and Minor Stopages Losses 0 40.410 0% 100%
Idling and minor stops (micro-stops)Share of lost time0 %Single extractor

Observation units

  • CBP product packaging machines (aggregate of 10 machines) · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline