Included study
Aggregate Analysis of Packaging Machine Effectiveness Using the OEE Method at PT. XYZ
1Bibliographic record
- Authors
- Satria Bagus Aji, Siti Nurhayati Ning Rahayu, Adi Fitra, Syarah Rizkia Feriaty, Tri Ngudi Wiyatno
- Year
- 2025
- Venue
- Jurnal Teknologi Terapan G-Tech
- Country
- Indonesia
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 10 machines
- Observation period
- 92 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
This study aims to analyze the effectiveness of ten CBP product packaging machines at PT. XYZ using the Overall Equipment Effectiveness (OEE) method.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
imprecise timing belts, improper timing belt fit, and broken timing beltstiming beltShow verbatim quote (Fishbone Diagram section (Machine))These issues contribute to downtime with a total of 5663 minutes and a frequency of 1171 occurrences. | Equipment failure (breakdowns) | Number of events | 1,171 occurrences | Both extractors agreed |
—Show verbatim quote (Conclusion)The Availability ratio averaged 91%, the Performance ratio 94.77%, and the Quality ratio 95%. | none | Quality | 95.0 % | Both extractors agreed |
—Show verbatim quote (Conclusion)The Availability ratio averaged 91%, the Performance ratio 94.77%, and the Quality ratio 95%. | none | Performance | 94.8 % | Both extractors agreed |
—Show verbatim quote (Conclusion)The Availability ratio averaged 91%, the Performance ratio 94.77%, and the Quality ratio 95%. | none | Availability | 91.0 % | Both extractors agreed |
sticky labels, jammed labels, labels too short or too long, and labels getting caughtlabel applicatorShow verbatim quote (Fishbone Diagram section (Material))These problems have caused downtime from October to December 2023, with a total downtime of 6448 minutes and a frequency of 1595 occurrences. | Equipment failure (breakdowns) | Number of events | 1,595 occurrences | Both extractors agreed |
—Show verbatim quote (Conclusion)The research results show that the average Overall Equipment Effectiveness (OEE) value of the ten CBP product packaging machines at PT. XYZ from October to December 2023 is 94%, which exceeds the world-class standard of 85%. | none | OEE | 94.0 % | Both extractors agreed |
sticky labels, jammed labels, labels too short or too long, and labels getting caughtlabel applicatorShow verbatim quote (Fishbone Diagram section (Material))These problems have caused downtime from October to December 2023, with a total downtime of 6448 minutes and a frequency of 1595 occurrences. | Equipment failure (breakdowns) | Lost time | 6,448 minutes | Both extractors agreed |
bucket errors, RCU errors, and thermocouple cable failures caused by overheating, leading to seal leaksscale bucket / RCU / thermocoupleShow verbatim quote (Fishbone Diagram section (Man))These issues have contributed a total of 19,425 minutes of downtime with 4524 occurrences from October to December 2023. | Equipment failure (breakdowns) | Number of events | 4,524 occurrences | Both extractors agreed |
imprecise timing belts, improper timing belt fit, and broken timing beltstiming beltShow verbatim quote (Fishbone Diagram section (Machine))These issues contribute to downtime with a total of 5663 minutes and a frequency of 1171 occurrences. | Equipment failure (breakdowns) | Lost time | 5,663 minutes | Both extractors agreed |
worn knives due to prolonged use, such as broken, misaligned, or jammed knivesknifeShow verbatim quote (Fishbone Diagram section (Machine))issues with worn knives due to prolonged use, such as broken, misaligned, or jammed knives, have caused downtime for the machines, contributing 1462 minutes of downtime and 131 occurrences. | Equipment failure (breakdowns) | Number of events | 131 occurrences | Both extractors agreed |
worn knives due to prolonged use, such as broken, misaligned, or jammed knivesknifeShow verbatim quote (Fishbone Diagram section (Machine))issues with worn knives due to prolonged use, such as broken, misaligned, or jammed knives, have caused downtime for the machines, contributing 1462 minutes of downtime and 131 occurrences. | Equipment failure (breakdowns) | Lost time | 1,462 minutes | Both extractors agreed |
bucket errors, RCU errors, and thermocouple cable failures caused by overheating, leading to seal leaksscale bucket / RCU / thermocoupleShow verbatim quote (Fishbone Diagram section (Man))These issues have contributed a total of 19,425 minutes of downtime with 4524 occurrences from October to December 2023. | Equipment failure (breakdowns) | Lost time | 19,425 minutes | Both extractors agreed |
Equipment Failure LossesShow verbatim quote (Table 8)Equipment Failure Losses 20.205 20.205 50% 50% | Equipment failure (breakdowns) | Share of lost time | 50.0 % | Both extractors agreed |
Equipment Failure LossesShow verbatim quote (Table 8)Equipment Failure Losses 20.205 20.205 50% 50% | Equipment failure (breakdowns) | Lost time | 20,205 Minutes | Both extractors agreed |
Setup and Adjusments LossesShow verbatim quote (Table 8)Setup and Adjusments Losses 2.425 40.410 6% 100% | Setup and adjustments | Share of lost time | 6.00 % | Both extractors agreed |
Setup and Adjusments LossesShow verbatim quote (Table 8)Setup and Adjusments Losses 2.425 40.410 6% 100% | Setup and adjustments | Lost time | 2,425 Minutes | Both extractors agreed |
Reduced Speed LossesShow verbatim quote (Table 8)Reduced Speed Losses 0 40.410 0% 100% | Reduced speed | Share of lost time | 0 % | Both extractors agreed |
Reduced Speed LossesShow verbatim quote (Table 8)Reduced Speed Losses 0 40.410 0% 100% | Reduced speed | Lost time | 0 Minutes | Both extractors agreed |
Rework LossesShow verbatim quote (Table 8)Rework Losses 8.890 29.095 22% 72% | Process defects (scrap and rework) | Share of lost time | 22.0 % | Both extractors agreed |
Rework LossesShow verbatim quote (Table 8)Rework Losses 8.890 29.095 22% 72% | Process defects (scrap and rework) | Lost time | 8,890 Minutes | Both extractors agreed |
Defect LossesShow verbatim quote (Table 8)Defect Losses 8.890 37.985 22% 94% | Process defects (scrap and rework) | Share of lost time | 22.0 % | Both extractors agreed |
Defect LossesShow verbatim quote (Table 8)Defect Losses 8.890 37.985 22% 94% | Process defects (scrap and rework) | Lost time | 8,890 Minutes | Both extractors agreed |
Idling and Minor Stopages LossesShow verbatim quote (Table 8)Idling and Minor Stopages Losses 0 40.410 0% 100% | Idling and minor stops (micro-stops) | Lost time | 0 Minutes | Single extractor |
Idling and Minor Stopages LossesShow verbatim quote (Table 8)Idling and Minor Stopages Losses 0 40.410 0% 100% | Idling and minor stops (micro-stops) | Share of lost time | 0 % | Single extractor |
Observation units
- CBP product packaging machines (aggregate of 10 machines) · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline