foratvise
Get Started

Causes of loss

Canonical causes of stoppage and inefficiency, classified into the six big losses, with their probability of presence and evidence grade.

Clear
7 causes
CauseLoss categoryProbability of presenceExpected share of lost timeEvidence gradeStudies / units
Product Loss in Transfer LinesWhole line or unspecified equipmentStart-up losses (reduced yield)0.9% [0.2–2.1%]0.4% [0.1–1.1%]C127 / 161
Product damage during restart after maintenancePackaging (forming, sealing, wrapping, case packing, palletizing)Start-up losses (reduced yield)0.5% [0.1–1.4%]0.2% [0.0–0.7%]D112 / 155
Boiler startup warm-up yield lossUtilities (steam, compressed air, chilled water, power)Start-up losses (reduced yield)0.5% [0.1–1.3%]0.2% [0.0–0.7%]D131 / 165
Product loss at start-up/shut-down due to line designWhole line or unspecified equipmentStart-up losses (reduced yield)0.5% [0.1–1.3%]0.2% [0.0–0.7%]D127 / 161
Startup yield loss in forming (blow moulding)Forming, moulding and depositingStart-up losses (reduced yield)0.4% [0.0–1.3%]0.2% [0.0–0.6%]D76 / 96
Filler start-up yield lossFillingStart-up losses (reduced yield)0.3% [0.0–1.0%]0.1% [0.0–0.5%]D120 / 162
Yield loss during start-up/transitionWhole line or unspecified equipmentStart-up losses (reduced yield)0.3% [0.0–1.0%]0.1% [0.0–0.5%]D127 / 161