Causes of loss
Canonical causes of stoppage and inefficiency, classified into the six big losses, with their probability of presence and evidence grade.
| Cause | Loss category | Probability of presence | Expected share of lost time | Evidence grade | Studies / units |
|---|---|---|---|---|---|
| Product Loss in Transfer LinesWhole line or unspecified equipment | Start-up losses (reduced yield) | 0.9% [0.2–2.1%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Product damage during restart after maintenancePackaging (forming, sealing, wrapping, case packing, palletizing) | Start-up losses (reduced yield) | 0.5% [0.1–1.4%] | 0.2% [0.0–0.7%] | D | 112 / 155 |
| Boiler startup warm-up yield lossUtilities (steam, compressed air, chilled water, power) | Start-up losses (reduced yield) | 0.5% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 131 / 165 |
| Product loss at start-up/shut-down due to line designWhole line or unspecified equipment | Start-up losses (reduced yield) | 0.5% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 127 / 161 |
| Startup yield loss in forming (blow moulding)Forming, moulding and depositing | Start-up losses (reduced yield) | 0.4% [0.0–1.3%] | 0.2% [0.0–0.6%] | D | 76 / 96 |
| Filler start-up yield lossFilling | Start-up losses (reduced yield) | 0.3% [0.0–1.0%] | 0.1% [0.0–0.5%] | D | 120 / 162 |
| Yield loss during start-up/transitionWhole line or unspecified equipment | Start-up losses (reduced yield) | 0.3% [0.0–1.0%] | 0.1% [0.0–0.5%] | D | 127 / 161 |