foratvise
Get Started
Included study

Integration of Energy Saving with Lean Production in a Food Processing Company

Open source

1Bibliographic record

Authors
Sameh A. Salah, Ahmad Mustafa
Year
2021
Venue
Journal of Machine Engineering
Country
Egypt
Segment
Dairy products
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
The production line 22 produces cheese in one kg with many recipes.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Labor
Show verbatim quote (Table 7)
Average wasted time Per Shift (Sec/shift) 0 - 152 116
Process defects (scrap and rework)Lost time0 Sec/shiftBoth extractors agreed
Changeover for new batchTetra Pak unit
Show verbatim quote (Section 4)
The changeover time reduced from 94 second to 45 second per changeover.
Setup and adjustmentsMean event duration45.0 sBoth extractors agreed
Labor
Show verbatim quote (Table 6)
Average wasted time Per Shift (Sec/shift) 1712
Process defects (scrap and rework)Lost time1,712 Sec/shiftBoth extractors agreed
Changeover for new batch
Show verbatim quote (Section 3.4, Data Analysis for waste)
Number of changeover per month = 15 changeover/Month.
Setup and adjustmentsNumber of events15.0 changeover/MonthBoth extractors agreed
Changeover for new batchTetra Pak unit
Show verbatim quote (Section 3.4, Data Analysis for waste)
Changeover time is calculated with 94 min.
Setup and adjustmentsMean event duration94.0 minBoth extractors agreed
Strapping machineStrapping machine
Show verbatim quote (Table 6)
Average wasted time Per Shift (Sec/shift) 1712 - 286 192
Idling and minor stops (micro-stops)Lost time192 Sec/shiftAdjudicated
Strapping machineStrapping machine
Show verbatim quote (Table 7)
Average wasted time Per Shift (Sec/shift) 0 - 152 116
Idling and minor stops (micro-stops)Lost time116 Sec/shiftAdjudicated
Final folderFinal folder
Show verbatim quote (Table 7)
Average wasted time Per Shift (Sec/shift) 0 - 152 116
Idling and minor stops (micro-stops)Lost time152 Sec/shiftAdjudicated
Final folderFinal folder
Show verbatim quote (Table 6)
Average wasted time Per Shift (Sec/shift) 1712 - 286 192
Idling and minor stops (micro-stops)Lost time286 Sec/shiftAdjudicated
—
Show verbatim quote (Fig. 3 / Table 4)
Line 19 Line 20 Line 21 Line 22 SEC(KWh/Ton) 177,7 196,7 96,3 221,2
noneSpecific energy221 KWh/TonBoth extractors agreed
Changeover for new batch
Show verbatim quote (Table 5)
Changeover for new batch 1410 Waiting
Setup and adjustmentsLost time1,410 MinutesAdjudicated
Final folderFinal folder
Show verbatim quote (Table 5)
Final folder 286 Waiting / Rework
Not classifiable from the reportLost time286 MinutesAdjudicated
Strapping machineStrapping machine
Show verbatim quote (Table 5)
Strapping machine 192 Waiting, Defects
Not classifiable from the reportLost time192 MinutesAdjudicated
—Tetra Pak unit
Show verbatim quote (Section 3.4, Data Analysis for waste)
Production rate = 60 Pack cheese 1kg/minute.
noneThroughput60.0 Pack cheese 1kg/minuteSingle extractor
Raw materials
Show verbatim quote (Table 5)
Raw materials 48 Unnecessary motion
Not classifiable from the reportLost time48.0 MinutesSingle extractor
Tetra Pak unitTetra Pak unit
Show verbatim quote (Table 5)
Tetra Pak unit 83 Defects, rework, over processing
Process defects (scrap and rework)Lost time83.0 MinutesSingle extractor
ConveyorConveyor
Show verbatim quote (Table 5)
Conveyor 46 Defects, inventory
Process defects (scrap and rework)Lost time46.0 MinutesSingle extractor
—
Show verbatim quote (Table 8)
SEC (KWh/ton) 221.2 187.9 33.3 15.1
noneSpecific energy188 KWh/tonSingle extractor
Defects - labor manual process over/under weight packs
Show verbatim quote (Table 7, Labor row)
Average waste Per Month (Ton/Month) 0
Process defects (scrap and rework)Lost time0 tonSingle extractor
Changeover for new batch
Show verbatim quote (Table 7, Changeover row)
Average waste Per Month (Ton/Month) 45
Setup and adjustmentsLost time45.0 tonSingle extractor
Final folderfinal folder
Show verbatim quote (Table 7, Final folder row)
Average waste Per Month (Ton/Month) 9.120
Idling and minor stops (micro-stops)Lost time9.12 tonSingle extractor
Strapping machinestrapping machine
Show verbatim quote (Table 7, Strapping machine row)
Average waste Per Month (Ton/Month) 6.96
Idling and minor stops (micro-stops)Lost time6.96 tonSingle extractor

Observation units

  • Line 22 · Whole line or unspecified equipment · After intervention
  • Line 22 · Whole line or unspecified equipment · Baseline