The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco
1Bibliographic record
- Authors
- —
- Year
- 2025
- Venue
- —
- Country
- Morocco
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 2 lines · — machines
- Observation period
- 120 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
an industrial agri-food company specialising in the manufacture of pastries, Viennese pastries and bakery products located in Casablanca, Morocco
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Section 3.1.4 narrative)to achieve an efficiency rate of 76% . (Gallaire, 2008). | none | OEE | 76.0 % | Both extractors agreed |
—Show verbatim quote (Section 3.1.4, OEE calculation table)Quality= Value Added/Net Operating = 250/260=96% | none | Quality | 96.0 % | Both extractors agreed |
—Show verbatim quote (Section 3.1.4, OEE calculation table)Productivity= Net running time/Gross running time = 260/390=66% | none | Performance | 66.0 % | Both extractors agreed |
—Show verbatim quote (Section 3.1.4, OEE calculation table)Availability= Gross uptime/Gross downtime = 390/440= 88% | none | Availability | 88.0 % | Both extractors agreed |
—Show verbatim quote (Section 3.1.4, OEE calculation table)OEE = Availability*Productivity*Quality = 55.8% | none | OEE | 55.8 % | Both extractors agreed |
waiting for materials to arriveShow verbatim quote (Table 1)Waiting times reduced from 20 min to 10 min and from 10 min to 5 min which represents 50% completion | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 10.0 min | Adjudicated |
Waiting timeShow verbatim quote (Section 3.1.4 narrative)the waiting time to 15 minutes | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 15.0 min | Adjudicated |
Touch-upsShow verbatim quote (Section 3.1.4 narrative)the time of touch-ups to 60 minutes | Process defects (scrap and rework) | Lost time | 60.0 min | Adjudicated |
non-compliant productsShow verbatim quote (Table 1)Only 5% of non- compliant products per month | Process defects (scrap and rework) | Defect rate | 5.00 % | Both extractors agreed |
non-conformityShow verbatim quote (Section 3.1.4 narrative)the non- conformity time to 5 minutes | Process defects (scrap and rework) | Lost time | 5.00 min | Both extractors agreed |
Non-quality/ Non-conformityShow verbatim quote (Section 3.1.4, OEE calculation table)Non-quality/ Non-conformity 10 min | Process defects (scrap and rework) | Lost time | 10.0 min | Both extractors agreed |
Waiting timeShow verbatim quote (Section 3.1.4, OEE calculation table)Waiting time 40 min | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 40.0 min | Adjudicated |
Touch-upsShow verbatim quote (Section 3.1.4, OEE calculation table)Touch-ups 90 min | Process defects (scrap and rework) | Lost time | 90.0 min | Adjudicated |
products with defectsShow verbatim quote (Table 1)20% ofproductswithdefects /month | Process defects (scrap and rework) | Defect rate | 20.0 % | Both extractors agreed |
BreakdownsmachinesShow verbatim quote (Section 3.1.4 narrative / OEE calculation table)This implies a waste of 50 minutes. | Equipment failure (breakdowns) | Lost time | 50.0 min | Single extractor |
BreakdownsmachinesShow verbatim quote (Section 3.1.4 narrative)We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked. | Equipment failure (breakdowns) | Number of events | 5.00 events | Single extractor |
BreakdownsmachinesShow verbatim quote (Section 3.1.4 narrative)We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked. | Equipment failure (breakdowns) | Mean event duration | 10.0 min | Single extractor |
MealsShow verbatim quote (Section 3.1.4, OEE calculation table)Meals 30 min | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 30.0 min | Single extractor |
BreakShow verbatim quote (Section 3.1.4, OEE calculation table)Break 10 min | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 10.0 min | Single extractor |
series changeoverShow verbatim quote (Table 1)The series changeover time is 20 min . | Setup and adjustments | Mean event duration | 20.0 min | Single extractor |
waiting for materials to arriveShow verbatim quote (Table 1)20 min wait for materials to arrive; | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 20.0 min | Single extractor |
waiting for instructions from superiorsShow verbatim quote (Table 1)10 minutes of waiting for instructions from superiors to start the day's production. | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 10.0 min | Single extractor |
BreakdownsmachinesShow verbatim quote (Section 3.1.4 narrative)the breakdowns were reduced to 2 machines/8 hours | Equipment failure (breakdowns) | Number of events | 2.00 events | Single extractor |
series changeoverShow verbatim quote (Table 1)Series changeover time reduced from 20 min to 10 min | Setup and adjustments | Mean event duration | 10.0 min | Single extractor |
waiting for instructions from superiorsShow verbatim quote (Table 1)Waiting times reduced from 20 min to 10 min and from 10 min to 5 min which represents 50% completion | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 5.00 min | Single extractor |
—Show verbatim quote (Table (OEE calculation), page 820)Breakdowns: 5 pannes * 10 min = 50 min | Equipment failure (breakdowns) | Lost time | 50.0 min | Single extractor |
series changeoverShow verbatim quote (Table 1, Waste number 4, page 818)The series changeover time is 20 min. | Setup and adjustments | Lost time | 20.0 min | Single extractor |
Observation units
- Production line (pastry/bakery) - Line 1 · Whole line or unspecified equipment · After intervention
- Production line (pastry/bakery) - Line 1 · Whole line or unspecified equipment · Baseline
- Production line - baseline · Whole line or unspecified equipment · Baseline