foratvise
Get Started
Included study

The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco

Open source

1Bibliographic record

Authors
—
Year
2025
Venue
—
Country
Morocco
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 2 lines · — machines
Observation period
120 days
Data collection
not_reported
Intervention
Show the setting as described by the study
an industrial agri-food company specialising in the manufacture of pastries, Viennese pastries and bakery products located in Casablanca, Morocco

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 3.1.4 narrative)
to achieve an efficiency rate of 76% . (Gallaire, 2008).
noneOEE76.0 %Both extractors agreed
—
Show verbatim quote (Section 3.1.4, OEE calculation table)
Quality= Value Added/Net Operating = 250/260=96%
noneQuality96.0 %Both extractors agreed
—
Show verbatim quote (Section 3.1.4, OEE calculation table)
Productivity= Net running time/Gross running time = 260/390=66%
nonePerformance66.0 %Both extractors agreed
—
Show verbatim quote (Section 3.1.4, OEE calculation table)
Availability= Gross uptime/Gross downtime = 390/440= 88%
noneAvailability88.0 %Both extractors agreed
—
Show verbatim quote (Section 3.1.4, OEE calculation table)
OEE = Availability*Productivity*Quality = 55.8%
noneOEE55.8 %Both extractors agreed
waiting for materials to arrive
Show verbatim quote (Table 1)
Waiting times reduced from 20 min to 10 min and from 10 min to 5 min which represents 50% completion
Organizational or external stops (material or personnel shortage, utilities outage)Lost time10.0 minAdjudicated
Waiting time
Show verbatim quote (Section 3.1.4 narrative)
the waiting time to 15 minutes
Organizational or external stops (material or personnel shortage, utilities outage)Lost time15.0 minAdjudicated
Touch-ups
Show verbatim quote (Section 3.1.4 narrative)
the time of touch-ups to 60 minutes
Process defects (scrap and rework)Lost time60.0 minAdjudicated
non-compliant products
Show verbatim quote (Table 1)
Only 5% of non- compliant products per month
Process defects (scrap and rework)Defect rate5.00 %Both extractors agreed
non-conformity
Show verbatim quote (Section 3.1.4 narrative)
the non- conformity time to 5 minutes
Process defects (scrap and rework)Lost time5.00 minBoth extractors agreed
Non-quality/ Non-conformity
Show verbatim quote (Section 3.1.4, OEE calculation table)
Non-quality/ Non-conformity 10 min
Process defects (scrap and rework)Lost time10.0 minBoth extractors agreed
Waiting time
Show verbatim quote (Section 3.1.4, OEE calculation table)
Waiting time 40 min
Organizational or external stops (material or personnel shortage, utilities outage)Lost time40.0 minAdjudicated
Touch-ups
Show verbatim quote (Section 3.1.4, OEE calculation table)
Touch-ups 90 min
Process defects (scrap and rework)Lost time90.0 minAdjudicated
products with defects
Show verbatim quote (Table 1)
20% ofproductswithdefects /month
Process defects (scrap and rework)Defect rate20.0 %Both extractors agreed
Breakdownsmachines
Show verbatim quote (Section 3.1.4 narrative / OEE calculation table)
This implies a waste of 50 minutes.
Equipment failure (breakdowns)Lost time50.0 minSingle extractor
Breakdownsmachines
Show verbatim quote (Section 3.1.4 narrative)
We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked.
Equipment failure (breakdowns)Number of events5.00 eventsSingle extractor
Breakdownsmachines
Show verbatim quote (Section 3.1.4 narrative)
We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked.
Equipment failure (breakdowns)Mean event duration10.0 minSingle extractor
Meals
Show verbatim quote (Section 3.1.4, OEE calculation table)
Meals 30 min
Planned downtime (scheduled maintenance, breaks, no demand)Lost time30.0 minSingle extractor
Break
Show verbatim quote (Section 3.1.4, OEE calculation table)
Break 10 min
Planned downtime (scheduled maintenance, breaks, no demand)Lost time10.0 minSingle extractor
series changeover
Show verbatim quote (Table 1)
The series changeover time is 20 min .
Setup and adjustmentsMean event duration20.0 minSingle extractor
waiting for materials to arrive
Show verbatim quote (Table 1)
20 min wait for materials to arrive;
Organizational or external stops (material or personnel shortage, utilities outage)Lost time20.0 minSingle extractor
waiting for instructions from superiors
Show verbatim quote (Table 1)
10 minutes of waiting for instructions from superiors to start the day's production.
Organizational or external stops (material or personnel shortage, utilities outage)Lost time10.0 minSingle extractor
Breakdownsmachines
Show verbatim quote (Section 3.1.4 narrative)
the breakdowns were reduced to 2 machines/8 hours
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
series changeover
Show verbatim quote (Table 1)
Series changeover time reduced from 20 min to 10 min
Setup and adjustmentsMean event duration10.0 minSingle extractor
waiting for instructions from superiors
Show verbatim quote (Table 1)
Waiting times reduced from 20 min to 10 min and from 10 min to 5 min which represents 50% completion
Organizational or external stops (material or personnel shortage, utilities outage)Lost time5.00 minSingle extractor
—
Show verbatim quote (Table (OEE calculation), page 820)
Breakdowns: 5 pannes * 10 min = 50 min
Equipment failure (breakdowns)Lost time50.0 minSingle extractor
series changeover
Show verbatim quote (Table 1, Waste number 4, page 818)
The series changeover time is 20 min.
Setup and adjustmentsLost time20.0 minSingle extractor

Observation units

  • Production line (pastry/bakery) - Line 1 · Whole line or unspecified equipment · After intervention
  • Production line (pastry/bakery) - Line 1 · Whole line or unspecified equipment · Baseline
  • Production line - baseline · Whole line or unspecified equipment · Baseline