Causes of loss
Canonical causes of stoppage and inefficiency, classified into the six big losses, with their probability of presence and evidence grade.
| Cause | Loss category | Probability of presence | Expected share of lost time | Evidence grade | Studies / units |
|---|---|---|---|---|---|
| Reduced speed operation of forming equipmentForming, moulding and depositing | Reduced speed | 2.1% [0.6–5.0%] | 1.3% [0.4–3.2%] | C | 76 / 96 |
| Unspecified reduced-speed operation on packaging linePackaging (forming, sealing, wrapping, case packing, palletizing) | Reduced speed | 1.6% [0.5–3.6%] | 1.0% [0.3–2.3%] | C | 112 / 155 |
| Separator running below rated throughputSeparation (centrifugation, filtration, membranes) | Reduced speed | 1.2% [0.2–3.9%] | 0.8% [0.1–2.5%] | D | 37 / 44 |
| HFCS transfer pump flow below design capacityMixing and blending | Reduced speed | 1.2% [0.2–3.7%] | 0.8% [0.1–2.4%] | D | 31 / 40 |
| Reduced speed loss (cause not specified)Whole line or unspecified equipment | Reduced speed | 1.2% [0.3–2.8%] | 0.7% [0.2–1.8%] | C | 127 / 161 |
| Reduced hammer mill throughputMilling and grinding | Reduced speed | 1.2% [0.2–3.5%] | 0.7% [0.1–2.2%] | D | 43 / 48 |
| Grinding mill component wear causing reduced throughput and scrapMilling and grinding | Reduced speed | 1.1% [0.2–3.6%] | 0.7% [0.1–2.3%] | D | 43 / 48 |
| Filler running below rated speedFilling | Reduced speed | 1.1% [0.3–2.7%] | 0.7% [0.2–1.8%] | C | 120 / 162 |
| Fouled/dirty forming diesForming, moulding and depositing | Reduced speed | 0.9% [0.2–2.4%] | 0.6% [0.1–1.6%] | D | 76 / 96 |
| Laser Marking Machine Speed LossLabeling and coding | Reduced speed | 0.8% [0.2–2.3%] | 0.5% [0.1–1.5%] | D | 85 / 113 |
| Non-value-added time within washing cycleContainer washing and rinsing | Reduced speed | 0.8% [0.2–2.2%] | 0.5% [0.1–1.4%] | D | 80 / 102 |
| Milling capacity underutilization (excess mill capacity vs. feed rate)Milling and grinding | Reduced speed | 0.7% [0.1–2.4%] | 0.5% [0.1–1.5%] | D | 43 / 48 |
| Operator-limited line speedPackaging (forming, sealing, wrapping, case packing, palletizing) | Reduced speed | 0.7% [0.1–1.8%] | 0.4% [0.1–1.2%] | D | 112 / 155 |
| Station cycle time constraintWhole line or unspecified equipment | Reduced speed | 0.7% [0.1–1.8%] | 0.4% [0.1–1.2%] | D | 127 / 161 |
| Boiler performance degradationUtilities (steam, compressed air, chilled water, power) | Reduced speed | 0.7% [0.1–1.8%] | 0.4% [0.1–1.1%] | D | 131 / 165 |
| Parasitic machine speed lossesWhole line or unspecified equipment | Reduced speed | 0.6% [0.1–1.7%] | 0.4% [0.1–1.1%] | D | 127 / 161 |
| Sealing system improperly adjustedCapping and seaming | Reduced speed | 0.6% [0.1–1.6%] | 0.4% [0.1–1.0%] | D | 82 / 109 |