foratvise
Get Started
Refrigeration and freezing

Frozen meat and poultry

Carcasses are cut and deboned, the cuts are frozen and packed.

In short

This is the line

Each station shows how far it can go according to physics. Select one to see its detail.

Out of every 100 hours planned for production
  1. 65produce

    Typical of the plants studied: the equivalent of 65 hours of good product at full speed (an OEE of 65 %).

  2. 21can be recovered

    The physics of this process allows up to 86 out of 100. This band is the possible improvement.

  3. 14are a physical limit

    No plant avoids them: mandatory cleaning and the minimum times needed to heat, cool or fill.

The typical value comes from 1 studies of Meat, poultry and seafood, Refrigeration and freezing.

The most limiting station is Refrigeration and freezing: it reaches 86 % at most.

Where the time is lost

  • Reduced speed27 %

    The line runs, but slower than it can.

  • Minor stops25 %

    Short stops the operator clears without maintenance: jams, waiting, blocked sensors.

  • Breakdowns22 %

    The machine stops because something fails and has to be repaired.

  • Changeovers and adjustments17 %

    Time between one product and the next: format change, cleaning, warm-up and fine tuning.

  • Defects7 %

    Product that comes out wrong and is scrapped or reworked.

  • Start-up losses3 %

    Product lost while the line settles after starting.

Split estimated from 1 studies of Meat, poultry and seafood, Refrigeration and freezing.

What most often stops lines like this one

Causes reported by the studies, from the most to the least frequent.

  1. Packaging machine breakdownappears in about 4 of every 100 lines studiedPackaging (forming, sealing, wrapping, case packing, palletizing) · Breakdowns · strong evidence
  2. Unspecified packaging defectappears in about 2 of every 100 lines studiedPackaging (forming, sealing, wrapping, case packing, palletizing) · Defects · good evidence
  3. Unspecified reduced-speed operation on packaging lineappears in about 2 of every 100 lines studiedPackaging (forming, sealing, wrapping, case packing, palletizing) · Reduced speed · limited evidence
  4. Flexible package seal/forming defectappears in about 1 of every 100 lines studiedPackaging (forming, sealing, wrapping, case packing, palletizing) · Defects · limited evidence
  5. Basic Condition and Operating Standard Non-Complianceappears in about 1 of every 100 lines studiedPackaging (forming, sealing, wrapping, case packing, palletizing) · Breakdowns · limited evidence

See the technical detail

Technical detail

Uncertainty intervals, physical models per station and sources, for anyone who wants to check each figure.

1Why it stops: the six big losses

The most probable situations inside each loss, according to 429 published studies. The percentage estimates the probability that a food and beverage line shows that cause; the number of studies reporting it is given below.
Availability

Equipment failure (breakdowns)

22 %of the lost time · 95% interval: 7–43 %
In the operations of this process
  1. Packaging machine breakdownPackaging (forming, sealing, wrapping, case packing, palletizing)4.4 %A1.9–8.4 %· 12 of 112 studies report it
  2. Basic Condition and Operating Standard Non-CompliancePackaging (forming, sealing, wrapping, case packing, palletizing)1.1 %C0.3–2.7 %· 3 of 112 studies report it
  3. Film handling and wrapping system failurePackaging (forming, sealing, wrapping, case packing, palletizing)0.8 %C0.2–1.9 %· 2 of 112 studies report it
  4. Tray-forming clamp/finger mechanism faultPackaging (forming, sealing, wrapping, case packing, palletizing)0.7 %C0.2–1.9 %· 2 of 112 studies report it
In any line
  1. Unplanned equipment breakdownWhole line or unspecified equipment11 %A6.1–18 %· 30 of 127 studies report it
  2. Mechanical, electrical or pneumatic component failureWhole line or unspecified equipment1.4 %B0.5–3.2 %· 5 of 127 studies report it

Setup and adjustments

17 %of the lost time · 95% interval: 4–35 %
In the operations of this process
  1. Packaging Equipment Setup and AdjustmentPackaging (forming, sealing, wrapping, case packing, palletizing)1.0 %C0.3–2.5 %· 3 of 112 studies report it
  2. Packaging line changeoverPackaging (forming, sealing, wrapping, case packing, palletizing)1.0 %C0.3–2.3 %· 3 of 112 studies report it
  3. Packer guide rail adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing)0.7 %C0.2–1.8 %· 2 of 112 studies report it
  4. WIP and packing material adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.4 %· 1 of 112 studies reports it
In any line
  1. Changeover / setup timeWhole line or unspecified equipment11 %A5.6–17 %· 28 of 127 studies report it
  2. Cleaning and sanitation downtimeWhole line or unspecified equipment1.0 %C0.3–2.3 %· 3 of 127 studies report it
Performance

Idling and minor stops (micro-stops)

25 %of the lost time · 95% interval: 8–53 %
In the operations of this process
  1. Waiting time due to line imbalance at cutting stationCutting, slicing and deboning0.9 %D0.1–2.7 %· 1 of 39 studies reports it
  2. Packaging/filling seal and handling mechanism faultPackaging (forming, sealing, wrapping, case packing, palletizing)0.8 %C0.2–2.0 %· 2 of 112 studies report it
  3. Palletizer minor stoppage (misalignment, jam or blockage)Packaging (forming, sealing, wrapping, case packing, palletizing)0.7 %C0.2–1.8 %· 2 of 112 studies report it
  4. Strapping machine malfunction / minor stoppagePackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.5 %· 1 of 112 studies reports it
In any line
  1. Idling and minor stoppagesWhole line or unspecified equipment1.9 %B0.6–4.1 %· 6 of 127 studies report it
  2. Workplace disorder / poor housekeepingWhole line or unspecified equipment1.0 %C0.3–2.4 %· 3 of 127 studies report it

Reduced speed

27 %of the lost time · 95% interval: 8–55 %
In the operations of this process
  1. Unspecified reduced-speed operation on packaging linePackaging (forming, sealing, wrapping, case packing, palletizing)1.6 %C0.5–3.6 %· 4 of 112 studies report it
  2. Operator-limited line speedPackaging (forming, sealing, wrapping, case packing, palletizing)0.7 %D0.1–1.8 %· 1 of 112 studies reports it
In any line
  1. Reduced speed loss (cause not specified)Whole line or unspecified equipment1.2 %C0.3–2.8 %· 3 of 127 studies report it
  2. Station cycle time constraintWhole line or unspecified equipment0.7 %D0.1–1.8 %· 1 of 127 studies reports it
Quality

Process defects (scrap and rework)

6.7 %of the lost time · 95% interval: 2–16 %
In the operations of this process
  1. Unspecified packaging defectPackaging (forming, sealing, wrapping, case packing, palletizing)1.6 %B0.5–3.7 %· 5 of 112 studies report it
  2. Flexible package seal/forming defectPackaging (forming, sealing, wrapping, case packing, palletizing)1.3 %C0.4–3.0 %· 4 of 112 studies report it
  3. Abdomen cut depth/position deviationCutting, slicing and deboning0.9 %D0.2–2.8 %· 1 of 39 studies reports it
  4. Cut piece dimension/weight out of customer specification limitsCutting, slicing and deboning0.9 %D0.2–2.9 %· 1 of 39 studies reports it
In any line
  1. Unspecified process defectsWhole line or unspecified equipment1.7 %B0.6–3.7 %· 6 of 127 studies report it
  2. Rework of off-specification productWhole line or unspecified equipment1.5 %B0.5–3.4 %· 5 of 127 studies report it

Start-up losses (reduced yield)

2.8 %of the lost time · 95% interval: 1–8 %
In the operations of this process
  1. Product damage during restart after maintenancePackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.4 %· 1 of 112 studies reports it
In any line
  1. Product Loss in Transfer LinesWhole line or unspecified equipment0.9 %C0.2–2.1 %· 3 of 127 studies report it
  2. Product loss at start-up/shut-down due to line designWhole line or unspecified equipment0.5 %D0.1–1.3 %· 1 of 127 studies reports it

Other reported causes

Outside the six big losses: planned stops, organisational or external causes and losses the studies do not classify.
  1. Miscellaneous and unclassified lossesWhole line or unspecified equipment · Not classifiable from the report10 %A5.3–17 %· 29 of 127 studies report it
  2. Raw material shortage or nonconformanceWhole line or unspecified equipment · Organizational or external stops (material or personnel shortage, utilities outage)3.1 %A1.3–5.9 %· 10 of 127 studies report it
  3. Maintenance Program Downtime (Planned and Reactive)Whole line or unspecified equipment · Planned downtime (scheduled maintenance, breaks, no demand)1.6 %B0.5–3.6 %· 5 of 127 studies report it
  4. Waiting for Raw Material or Ingredient SupplyWhole line or unspecified equipment · Organizational or external stops (material or personnel shortage, utilities outage)1.5 %B0.5–3.5 %· 5 of 127 studies report it
  5. Unspecified packaging line lossPackaging (forming, sealing, wrapping, case packing, palletizing) · Not classifiable from the report1.4 %C0.4–3.2 %· 4 of 112 studies report it
  6. Miscellaneous non-specific line stoppageWhole line or unspecified equipment · Organizational or external stops (material or personnel shortage, utilities outage)1.3 %C0.4–2.9 %· 4 of 127 studies report it

The dot is the estimated probability and the band its 95% credible interval. All bars share one scale, from 0 to 20 %. The letter is the evidence grade: A is the strongest and D means the cause rests on one study or none.

Split of the lost time estimated from 1 studies of Meat, poultry and seafood, Refrigeration and freezing.

2Chain of unit operations

3 of 3 operations have a published physical model. Select an operation for its full derivation.
  1. Energy per unit of product
    Theoretical6.57 × 10⁻⁶ kJ/kgBest available technique23.3 kJ/kgTypical39.5 kJ/kg
    Yield
    Theoretical1.00Best documented0.880
    Quality
    Theoretical0.9675Typical0.935
    Availability
    Theoretical0.938
    Performance
    Theoretical1.00
    OEE
    Theoretical0.907
  2. Energy per unit of product
    Theoretical32.2 kJ/kgBest available technique153 kJ/kgBest documented288 kJ/kgTypical1,363 kJ/kg
    Cycle or residence time
    Theoretical0.340 hBest available technique0.680 h
    Throughput
    Theoretical2.94 1/hBest available technique1.47 1/h
    Yield
    Theoretical0.9958
    Quality
    Theoretical0.9987
    Availability
    Theoretical0.863
    Performance
    Theoretical1.00
    OEE
    Theoretical0.862
  3. Cycle or residence time
    Theoretical0.00911 sTypical0.300 s
    Throughput
    Theoretical158 1/minTypical89.6 1/min
    Energy per unit of product
    Theoretical0 JTypical147 J
    Quality
    Theoretical1.00000
    Yield
    Theoretical0.9982
    Availability
    Theoretical1.00
    Performance
    Theoretical0.986
    OEE
    Theoretical0.986

3Line-level physics-bounded OEE

Bracket for the whole line from the modelled operations.
  • Upper value (ideal buffers)
    0.860 [0.812–0.906]
  • Lower value (no buffers)
    0.772 [0.724–0.822]

Based on 3 of 3 operations.

Upper value: ideal buffers and synchronised unavoidable stops (the line is bounded by its most constrained modelled operation). Lower value: no buffers and independent unavoidable stops (downtime ratios add, quality factors multiply, the slowest operation sets the rate). Operations without a physical model are not yet included, so both values are upper bounds for the whole line.

4Composition of lost time

Share of lost time among the six big losses for Meat, poultry and seafood, Refrigeration and freezing.
Evidence gradeD1 studies, 1 units
  • Equipment failure (breakdowns)
  • Setup and adjustments
  • Idling and minor stops (micro-stops)
  • Reduced speed
  • Process defects (scrap and rework)
  • Start-up losses (reduced yield)
  • Equipment failure (breakdowns)Availability
    22% [7–43%]prediction 0–64%
  • Setup and adjustmentsAvailability
    17% [4–35%]prediction 0–82%
  • Idling and minor stops (micro-stops)Performance
    25% [8–53%]prediction 0–87%
  • Reduced speedPerformance
    27% [8–55%]prediction 0–89%
  • Process defects (scrap and rework)Quality
    6.7% [1.7–15.7%]prediction 0.0–28.6%
  • Start-up losses (reduced yield)Quality
    2.8% [0.6–8.4%]prediction 0.0–51.5%

Dots are posterior means; thick whiskers are 95% credible intervals; thin whiskers are 95% prediction intervals for a new line.

5Most probable causes

Probability of presence of each cause in food and beverage lines (all segments), highest first. The estimate by segment is on the page of each cause.

6Documented OEE

Pooled OEE and factors reported by the included studies of this group, and the best documented value.
MetricPooled estimate [95% CrI]Studies / unitsBest documented
OEE0.651 [0.526–0.753]1 / 10.629 · View study
Show verbatim quote
The OEE results from these observations were 62.87%.
Availability0.843 [0.766–0.915]1 / 10.960 · View study
Show verbatim quote
A result from the 15 observations showed availability of 96%, performance of 65.84% and quality of 99%.
Performance0.787 [0.660–0.868]1 / 10.658 · View study
Show verbatim quote
A result from the 15 observations showed availability of 96%, performance of 65.84% and quality of 99%.
Quality0.942 [0.887–0.977]1 / 10.990 · View study
Show verbatim quote
A result from the 15 observations showed availability of 96%, performance of 65.84% and quality of 99%.

OEE documented in other processes of Meat, poultry and seafood

Process familyOEEStudies / unitsEvidence grade
Filling and packaging line0.661 [0.582–0.718]3 / 4C
Thermal processing0.633 [0.521–0.713]0 / 0D
Forming, baking and cooking0.640 [0.548–0.703]3 / 6C
Slaughter, cutting and primary processing0.655 [0.573–0.722]4 / 4C
Whole plant or unspecified0.631 [0.534–0.697]1 / 1D