Causes of loss
Canonical causes of stoppage and inefficiency, classified into the six big losses, with their probability of presence and evidence grade.
| Cause | Loss category | Probability of presence | Expected share of lost time | Evidence grade | Studies / units |
|---|---|---|---|---|---|
| Changeover / setup timeWhole line or unspecified equipment | Setup and adjustments | 11% [6–17%] | 7.0% [3.7–11.6%] | A | 127 / 161 |
| Filler changeover and adjustmentFilling | Setup and adjustments | 3.6% [1.5–7.1%] | 2.0% [0.8–4.0%] | A | 120 / 162 |
| Labeling machine changeover and setupLabeling and coding | Setup and adjustments | 2.3% [0.8–5.1%] | 1.3% [0.4–2.9%] | B | 85 / 113 |
| Extruder changeover (die/recipe change and line clearing)Extrusion | Setup and adjustments | 1.6% [0.4–4.2%] | 0.9% [0.2–2.5%] | C | 59 / 72 |
| Syrup batching changeover and setup timeMixing and blending | Setup and adjustments | 1.3% [0.3–3.8%] | 0.7% [0.1–2.1%] | C | 31 / 40 |
| Manual cleaning of mixing equipment during changeoverMixing and blending | Setup and adjustments | 1.3% [0.2–3.7%] | 0.7% [0.1–2.2%] | C | 31 / 40 |
| Format/mould changeover on forming equipmentForming, moulding and depositing | Setup and adjustments | 1.3% [0.3–3.2%] | 0.7% [0.2–1.9%] | C | 76 / 96 |
| Changeover and setup adjustment on grinding millMilling and grinding | Setup and adjustments | 1.3% [0.2–3.7%] | 0.7% [0.1–1.9%] | C | 43 / 48 |
| Packaging Equipment Setup and AdjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 1.0% [0.3–2.5%] | 0.6% [0.1–1.4%] | C | 112 / 155 |
| Cleaning and sanitation downtimeWhole line or unspecified equipment | Setup and adjustments | 1.0% [0.3–2.3%] | 0.6% [0.1–1.4%] | C | 127 / 161 |
| Packaging line changeoverPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 1.0% [0.3–2.3%] | 0.5% [0.1–1.3%] | C | 112 / 155 |
| Line Startup DelayWhole line or unspecified equipment | Setup and adjustments | 0.9% [0.3–2.2%] | 0.5% [0.1–1.3%] | C | 127 / 161 |
| CIP (Clean-in-Place) cleaning cycleFilling | Setup and adjustments | 0.9% [0.2–2.2%] | 0.5% [0.1–1.2%] | C | 120 / 162 |
| Changeover setup time (internal and external activities)Separation (centrifugation, filtration, membranes) | Setup and adjustments | 0.8% [0.1–2.6%] | 0.5% [0.1–1.5%] | D | 37 / 44 |
| Raw material verification and staging during changeoverMixing and blending | Setup and adjustments | 0.8% [0.1–2.5%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Manual raw material weighing and transfer to mixing stageMixing and blending | Setup and adjustments | 0.8% [0.1–2.7%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Machine start-up and shutdown procedure timeMixing and blending | Setup and adjustments | 0.8% [0.1–2.7%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Press changeover for format/product changeSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.8% [0.1–2.6%] | 0.5% [0.1–1.5%] | D | 37 / 44 |
| Manual Pallet Transport Delay to Machine FloorMixing and blending | Setup and adjustments | 0.8% [0.1–2.5%] | 0.5% [0.1–1.4%] | D | 31 / 40 |
| Bag breaker cleaning changeoverMixing and blending | Setup and adjustments | 0.8% [0.1–2.6%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Deflector position adjustmentMilling and grinding | Setup and adjustments | 0.8% [0.1–2.3%] | 0.4% [0.1–1.3%] | D | 43 / 48 |
| Extruder setup and adjustmentExtrusion | Setup and adjustments | 0.7% [0.1–2.3%] | 0.4% [0.1–1.3%] | D | 59 / 72 |
| Changeover retooling on fillerFilling | Setup and adjustments | 0.7% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 120 / 162 |
| Changeover setup delay (baking)Baking | Setup and adjustments | 0.7% [0.1–2.1%] | 0.4% [0.1–1.2%] | D | 60 / 73 |
| Changeover disassembly, cleaning and reassembly of machine partsWhole line or unspecified equipment | Setup and adjustments | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Oven changeover and warm-up downtimeBaking | Setup and adjustments | 0.7% [0.1–2.1%] | 0.4% [0.1–1.2%] | D | 60 / 73 |
| Equipment calibration/adjustment errorWhole line or unspecified equipment | Setup and adjustments | 0.7% [0.2–1.7%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Packer guide rail adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 112 / 155 |
| Valve FailureForming, moulding and depositing | Setup and adjustments | 0.6% [0.1–1.8%] | 0.3% [0.1–1.0%] | D | 76 / 96 |
| Capping/sealing mechanism readjustmentCapping and seaming | Setup and adjustments | 0.6% [0.1–1.8%] | 0.3% [0.1–1.0%] | D | 82 / 109 |
| Scheduled preventive maintenance of sealing machineCapping and seaming | Setup and adjustments | 0.6% [0.1–1.7%] | 0.4% [0.1–1.0%] | D | 82 / 109 |
| Capping/seaming line changeoverCapping and seaming | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 82 / 109 |
| Conveyor cleaning during changeoverConveying and accumulation | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 86 / 112 |
| Star wheel and guide adjustment during format changeoverLabeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–1.0%] | D | 85 / 113 |
| Preparation of tools and PPE before changeoverLabeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Conveyor belt and guide rail adjustmentLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 85 / 113 |
| Changeover parts placementLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 85 / 113 |
| Glue roller and scraper adjustmentLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Label magazine cleaningLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Centering disc replacement (format changeover)Labeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Infeed timing (worm) screw changeover adjustmentLabeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Reject/discard system adjustmentLabeling and coding | Setup and adjustments | 0.5% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Manual bottle pushing in pasteurizerPasteurization | Setup and adjustments | 0.5% [0.1–1.9%] | 0.3% [0.0–1.0%] | D | 26 / 29 |
| WIP and packing material adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Shift start/end line setupPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Changeover material staging and organizationPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Equipment configuration/setup timeFermentation | Setup and adjustments | 0.5% [0.1–1.7%] | 0.3% [0.0–1.0%] | D | 29 / 33 |
| Changeover adjustment of guide rails and air-blower positioningPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Cardboard cutout feeding module fine-tuning stoppagesPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Film and film-holding equipment changeoverPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Changeover material staging/fetching delayFilling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Die or tooling retrieval delay during changeoverFilling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Screw conveyor start-up/shutdown and cleaning sequence during changeoverSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.5% [0.1–1.7%] | 0.3% [0.0–1.0%] | D | 37 / 44 |
| Fallen-bottle detection sensor adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Head Sensor AdjustmentWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Changeover retooling and team briefing downtimeWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Waiting for supervisor confirmation/authorizationWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Manual transfer of product trays to cold storageWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Motor overcurrent verification during changeover adjustmentWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Changeover delay due to searching for and fetching tools/utensilsWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Packaging program change and parameter recalculationPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.7%] | D | 112 / 155 |
| Detergent/disinfectant solution preparationCleaning in place (CIP) and sanitation | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 129 / 163 |
| Pre-production resource staging and preparationSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.5% [0.1–1.6%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Cooker Steam Warm-up and ShutdownSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.5% [0.1–1.6%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Changeover documentation and paperwork delayFilling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.0–0.7%] | D | 120 / 162 |
| Mixed and undifferentiated filler losses (changeover, breakdown, stoppage, defects)Filling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Grinding liner replacement changeoverMilling and grinding | Setup and adjustments | 0.5% [0.1–1.5%] | 0.3% [0.0–0.9%] | D | 43 / 48 |
| Raw material staging and setup for cookingCooking and frying | Setup and adjustments | 0.4% [0.1–1.5%] | 0.3% [0.0–0.8%] | D | 57 / 69 |
| Cooking equipment start-up and warm-upCooking and frying | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 57 / 69 |
| Tool/mould preparation during changeoverBaking | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 60 / 73 |
| Storage/staging delay during changeoverBaking | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 60 / 73 |
| Conveyor chain link repairBaking | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 60 / 73 |
| Transport/conveying system changeover adjustmentBaking | Setup and adjustments | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 60 / 73 |
| Start-of-production warm-up and adjustmentForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Product flush/purge during changeoverForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Pre-batch equipment cleaning cycleForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Mold base-forming adjustment during changeoverForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.6%] | D | 76 / 96 |
| Changeover adjustment time to first good unitForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Tooling preparation and transport delay for changeoverForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Inkjet printer/coder adjustmentLabeling and coding | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 85 / 113 |
| Folding bracket assembly during changeoverPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Non-optimized changeover procedureFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| CIP conductivity/temperature transmitter malfunctionFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Transport System Changeover AdjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Shift handover documentation updateFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Manual ingredient loading into filling tankFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Changeover tooling disorganization (lack of 5S)Filling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Cut-open rework of filled packages at changeoverFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Changeover to new plastic package formatFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Waiting for empty container supplyFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Buffer/Bright Tank Changeover DelayFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| First-piece inspection after changeoverFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Extended setup time after weekend shutdownWhole line or unspecified equipment | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Fill volume setpoint adjustmentFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| CIP cleaning during changeoverCleaning in place (CIP) and sanitation | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 129 / 163 |
| Commissioning of new inline density/gravity sensorFilling | Setup and adjustments | 0.3% [0.1–0.9%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Boiler changeover and adjustmentUtilities (steam, compressed air, chilled water, power) | Setup and adjustments | 0.3% [0.1–0.9%] | 0.2% [0.0–0.5%] | D | 131 / 165 |
| Equipment installation time during changeoverWhole line or unspecified equipment | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Boiler warm-up and equipment shutdown sequence at startupUtilities (steam, compressed air, chilled water, power) | Setup and adjustments | 0.3% [0.1–0.9%] | 0.2% [0.0–0.5%] | D | 131 / 165 |