Milk powder
Pasteurized milk is concentrated in a falling-film evaporator, spray dried and packed.
In short
This is the line
Each station shows how far it can go according to physics. Select one to see its detail.
Drag to rotate the view
- 67produce
Typical of the plants studied: the equivalent of 67 hours of good product at full speed (an OEE of 67 %).
- 19can be recovered
The physics of this process allows up to 86 out of 100. This band is the possible improvement.
- 14are a physical limit
No plant avoids them: mandatory cleaning and the minimum times needed to heat, cool or fill.
No included study measures this exact process: the typical value is that of all food and beverage lines (244 studies).
The most limiting station is Evaporation: it reaches 87 % at most.
Where the time is lost
- Breakdowns27 %
The machine stops because something fails and has to be repaired.
- Reduced speed24 %
The line runs, but slower than it can.
- Minor stops22 %
Short stops the operator clears without maintenance: jams, waiting, blocked sensors.
- Changeovers and adjustments19 %
Time between one product and the next: format change, cleaning, warm-up and fine tuning.
- Defects6 %
Product that comes out wrong and is scrapped or reworked.
- Start-up losses2 %
Product lost while the line settles after starting.
Split for all food and beverage lines (195 studies); no study measures it for this exact process.
What most often stops lines like this one
Causes reported by the studies, from the most to the least frequent.
- Packaging machine breakdownappears in about 4 of every 100 lines studied
- Dryer equipment malfunction and downtimeappears in about 4 of every 100 lines studied
- Sucrose Loss to Acid Hydrolysis in Evaporationappears in about 2 of every 100 lines studied
- Unspecified packaging defectappears in about 2 of every 100 lines studied
- Unspecified reduced-speed operation on packaging lineappears in about 2 of every 100 lines studied
Technical detail
Uncertainty intervals, physical models per station and sources, for anyone who wants to check each figure.
1Why it stops: the six big losses
Equipment failure (breakdowns)
27 %- Packaging machine breakdownPackaging (forming, sealing, wrapping, case packing, palletizing)4.4 %A1.9–8.4 %· 12 of 112 studies report it
- Dryer equipment malfunction and downtimeDrying3.6 %C0.9–9.2 %· 4 of 28 studies report it
- Reactive maintenance restart delayDrying1.1 %D0.2–3.6 %· 1 of 28 studies reports it
- Inadequate preventive maintenance (cleaning, lubrication, tensioning)Drying1.1 %D0.2–3.3 %· 1 of 28 studies reports it
- Unplanned equipment breakdownWhole line or unspecified equipment11 %A6.1–18 %· 30 of 127 studies report it
- Mechanical, electrical or pneumatic component failureWhole line or unspecified equipment1.4 %B0.5–3.2 %· 5 of 127 studies report it
Setup and adjustments
19 %- Packaging Equipment Setup and AdjustmentPackaging (forming, sealing, wrapping, case packing, palletizing)1.0 %C0.3–2.5 %· 3 of 112 studies report it
- Packaging line changeoverPackaging (forming, sealing, wrapping, case packing, palletizing)1.0 %C0.3–2.3 %· 3 of 112 studies report it
- Packer guide rail adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing)0.7 %C0.2–1.8 %· 2 of 112 studies report it
- WIP and packing material adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.4 %· 1 of 112 studies reports it
- Changeover / setup timeWhole line or unspecified equipment11 %A5.6–17 %· 28 of 127 studies report it
- Cleaning and sanitation downtimeWhole line or unspecified equipment1.0 %C0.3–2.3 %· 3 of 127 studies report it
Idling and minor stops (micro-stops)
22 %- Packaging/filling seal and handling mechanism faultPackaging (forming, sealing, wrapping, case packing, palletizing)0.8 %C0.2–2.0 %· 2 of 112 studies report it
- Palletizer minor stoppage (misalignment, jam or blockage)Packaging (forming, sealing, wrapping, case packing, palletizing)0.7 %C0.2–1.8 %· 2 of 112 studies report it
- Strapping machine malfunction / minor stoppagePackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.5 %· 1 of 112 studies reports it
- Fallen Product Requiring CleanupPackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.5 %· 1 of 112 studies reports it
- Idling and minor stoppagesWhole line or unspecified equipment1.9 %B0.6–4.1 %· 6 of 127 studies report it
- Workplace disorder / poor housekeepingWhole line or unspecified equipment1.0 %C0.3–2.4 %· 3 of 127 studies report it
Reduced speed
24 %- Unspecified reduced-speed operation on packaging linePackaging (forming, sealing, wrapping, case packing, palletizing)1.6 %C0.5–3.6 %· 4 of 112 studies report it
- Operator-limited line speedPackaging (forming, sealing, wrapping, case packing, palletizing)0.7 %D0.1–1.8 %· 1 of 112 studies reports it
- Reduced speed loss (cause not specified)Whole line or unspecified equipment1.2 %C0.3–2.8 %· 3 of 127 studies report it
- Station cycle time constraintWhole line or unspecified equipment0.7 %D0.1–1.8 %· 1 of 127 studies reports it
Process defects (scrap and rework)
6.2 %- Sucrose Loss to Acid Hydrolysis in EvaporationEvaporation2.5 %C0.5–6.7 %· 3 of 29 studies report it
- Unspecified packaging defectPackaging (forming, sealing, wrapping, case packing, palletizing)1.6 %B0.5–3.7 %· 5 of 112 studies report it
- Flexible package seal/forming defectPackaging (forming, sealing, wrapping, case packing, palletizing)1.3 %C0.4–3.0 %· 4 of 112 studies report it
- Off-spec liquid product from pasteurized base tankPasteurization1.0 %D0.2–3.4 %· 1 of 26 studies reports it
- Unspecified process defectsWhole line or unspecified equipment1.7 %B0.6–3.7 %· 6 of 127 studies report it
- Rework of off-specification productWhole line or unspecified equipment1.5 %B0.5–3.4 %· 5 of 127 studies report it
Start-up losses (reduced yield)
2.4 %- Product damage during restart after maintenancePackaging (forming, sealing, wrapping, case packing, palletizing)0.5 %D0.1–1.4 %· 1 of 112 studies reports it
- Product Loss in Transfer LinesWhole line or unspecified equipment0.9 %C0.2–2.1 %· 3 of 127 studies report it
- Product loss at start-up/shut-down due to line designWhole line or unspecified equipment0.5 %D0.1–1.3 %· 1 of 127 studies reports it
Other reported causes
- Miscellaneous and unclassified lossesWhole line or unspecified equipment · Not classifiable from the report10 %A5.3–17 %· 29 of 127 studies report it
- Raw material shortage or nonconformanceWhole line or unspecified equipment · Organizational or external stops (material or personnel shortage, utilities outage)3.1 %A1.3–5.9 %· 10 of 127 studies report it
- Maintenance Program Downtime (Planned and Reactive)Whole line or unspecified equipment · Planned downtime (scheduled maintenance, breaks, no demand)1.6 %B0.5–3.6 %· 5 of 127 studies report it
- Waiting for Raw Material or Ingredient SupplyWhole line or unspecified equipment · Organizational or external stops (material or personnel shortage, utilities outage)1.5 %B0.5–3.5 %· 5 of 127 studies report it
- Unspecified packaging line lossPackaging (forming, sealing, wrapping, case packing, palletizing) · Not classifiable from the report1.4 %C0.4–3.2 %· 4 of 112 studies report it
- Miscellaneous non-specific line stoppageWhole line or unspecified equipment · Organizational or external stops (material or personnel shortage, utilities outage)1.3 %C0.4–2.9 %· 4 of 127 studies report it
The dot is the estimated probability and the band its 95% credible interval. All bars share one scale, from 0 to 20 %. The letter is the evidence grade: A is the strongest and D means the cause rests on one study or none.
No included study reports the split of the lost time for Dairy products, Concentration and drying; the percentages in the headers are those of all food and beverage lines (195 studies).
2Chain of unit operations
- PasteurizationPhysical model
- Energy per unit of product
- Theoretical0 kJ/kgBest available technique26.8 kJ/kgTypical80.4 kJ/kg
- Cycle or residence time
- Theoretical15.0 s
- Throughput
- Theoretical196 1/h
- Availability
- Theoretical0.9844Best documented0.958Typical0.850
- Yield
- Theoretical0.99992
- Quality
- Theoretical0.9986
- Performance
- Theoretical1.00
- OEE
- Theoretical0.983
- EvaporationPhysical model
- Energy per unit of product
- Theoretical1.46 kJ/kgBest available technique36.0 kJ/kgBest documented54.0 kJ/kgTypical396 kJ/kg
- steam_single_effect
- Theoretical1.0031 kg/kg
- steam_double_effect
- Theoretical0.5035 kg/kg
- steam_triple_effect
- Theoretical0.3370 kg/kg
- Throughput
- Theoretical9.17 kg/m²/h
- run_length
- Theoretical7.37 h
- Performance
- Theoretical0.933
- Availability
- Theoretical0.952Typical0.915
- Yield
- Theoretical0.983
- Quality
- Theoretical0.983
- OEE
- Theoretical0.873
- DryingPhysical model
- Energy per unit of product
- Theoretical7.96 kJ/kgTypical7,389 kJ/kg
- Throughput
- Theoretical0.0593 kg/kg
- Cycle or residence time
- Theoretical1.59 s
- Yield
- Theoretical0.9937Best documented0.974
- Quality
- Theoretical0.9987
- Availability
- Theoretical0.946
- Performance
- Theoretical1.00
- OEE
- Theoretical0.945
- Cycle or residence time
- Theoretical0.00911 sTypical0.300 s
- Throughput
- Theoretical158 1/minTypical89.6 1/min
- Energy per unit of product
- Theoretical0 JTypical147 J
- Quality
- Theoretical1.00000
- Yield
- Theoretical0.9982
- Availability
- Theoretical1.00
- Performance
- Theoretical0.986
- OEE
- Theoretical0.986
Cross-cutting operations
Operations that serve the whole line and are not part of the product flow.
- Cleaning in place (CIP) and sanitationPhysical model
- Cycle or residence time
- Theoretical22.5 minTypical90.0 min
- Other
- Theoretical0.00416 m³/tonne
- Energy per unit of product
- Theoretical0.00157 kJ/kgBest available technique0.477 kJ/kg
- Availability
- Theoretical0.953Typical0.842
- Quality
- Theoretical0.998
- OEE
- Theoretical0.951
3Line-level physics-bounded OEE
- Upper value (ideal buffers)0.856 [0.748–0.930]
- Lower value (no buffers)0.798 [0.687–0.879]
Based on 4 of 4 operations.
Upper value: ideal buffers and synchronised unavoidable stops (the line is bounded by its most constrained modelled operation). Lower value: no buffers and independent unavoidable stops (downtime ratios add, quality factors multiply, the slowest operation sets the rate). Operations without a physical model are not yet included, so both values are upper bounds for the whole line.
4Composition of lost time
- Equipment failure (breakdowns)
- Setup and adjustments
- Idling and minor stops (micro-stops)
- Reduced speed
- Process defects (scrap and rework)
- Start-up losses (reduced yield)
- Equipment failure (breakdowns)Availability26% [10–49%]prediction 0–69%
- Setup and adjustmentsAvailability19% [5–41%]prediction 0–84%
- Idling and minor stops (micro-stops)Performance22% [7–48%]prediction 0–84%
- Reduced speedPerformance24% [8–51%]prediction 0–88%
- Process defects (scrap and rework)Quality5.9% [1.5–13.4%]prediction 0.0–26.3%
- Start-up losses (reduced yield)Quality2.5% [0.5–7.4%]prediction 0.0–49.7%
Dots are posterior means; thick whiskers are 95% credible intervals; thin whiskers are 95% prediction intervals for a new line.
5Most probable causes
- Unplanned equipment breakdownWhole line or unspecified equipment · Equipment failure (breakdowns)11% [6–18%]A127 studies
- Changeover / setup timeWhole line or unspecified equipment · Setup and adjustments11% [6–17%]A127 studies
- Miscellaneous and unclassified lossesWhole line or unspecified equipment · not classifiable10% [5–17%]A127 studies
- Packaging machine breakdownPackaging (forming, sealing, wrapping, case packing, palletizing) · Equipment failure (breakdowns)4.4% [1.9–8.4%]A112 studies
- Dryer equipment malfunction and downtimeDrying · Equipment failure (breakdowns)3.6% [0.9–9.2%]C28 studies
- Raw material shortage or nonconformanceWhole line or unspecified equipment · organizational external3.1% [1.3–5.9%]A127 studies
- Sucrose Loss to Acid Hydrolysis in EvaporationEvaporation · Process defects (scrap and rework)2.5% [0.5–6.7%]C29 studies
- Idling and minor stoppagesWhole line or unspecified equipment · Idling and minor stops (micro-stops)1.9% [0.6–4.1%]B127 studies
- Unspecified process defectsWhole line or unspecified equipment · Process defects (scrap and rework)1.7% [0.6–3.7%]B127 studies
- Unspecified packaging defectPackaging (forming, sealing, wrapping, case packing, palletizing) · Process defects (scrap and rework)1.6% [0.5–3.7%]B112 studies
- Maintenance Program Downtime (Planned and Reactive)Whole line or unspecified equipment · planned downtime1.6% [0.5–3.6%]B127 studies
- Unspecified reduced-speed operation on packaging linePackaging (forming, sealing, wrapping, case packing, palletizing) · Reduced speed1.6% [0.5–3.6%]C112 studies
- Waiting for Raw Material or Ingredient SupplyWhole line or unspecified equipment · organizational external1.5% [0.5–3.5%]B127 studies
- Rework of off-specification productWhole line or unspecified equipment · Process defects (scrap and rework)1.5% [0.5–3.4%]B127 studies
- Mechanical, electrical or pneumatic component failureWhole line or unspecified equipment · Equipment failure (breakdowns)1.4% [0.5–3.2%]B127 studies
6Documented OEE
No included study reports the OEE of Dairy products, Concentration and drying. The pooled estimate over all food and beverage lines is shown.
| Metric | Pooled estimate [95% CrI] | Studies / units | Best documented |
|---|---|---|---|
| OEE | 0.666 [0.614–0.711] | 244 / 379 | 1.00 · View studyShow verbatim quoteBased on the OEE calculation, the average value is 100%, indicating that the OEE meets world-class standards. |
| Availability | 0.844 [0.803–0.880] | 203 / 364 | 1.00 · View studyShow verbatim quote1.00 0.73 0.27 1.00 Lauterstar OEE Efficiency components |
| Performance | 0.820 [0.767–0.860] | 164 / 287 | 1.00 · View studyShow verbatim quote52.10% 99.95% 0,05% 0% 100% 99.37% 99.32% |
| Quality | 0.941 [0.912–0.959] | 154 / 270 | 1.00 · View studyShow verbatim quotePerhitungan nilai quality rate mesin washer tank bernilai 99,95%, mesin blancher bernilai 99,87%, mesin cooling bernilai 99,95%, mesin grading bernilai 99,97%, mesin sortasi belt bernilai 99,84%, mesin slicing bernilai 99,12%, mesin exhaust bernilai 100,00%, mesin seamer bernilai 99,80%, dan mesin retort bernilai |
OEE documented in other processes of Dairy products
| Process family | OEE | Studies / units | Evidence grade |
|---|---|---|---|
| Filling and packaging line | 0.692 [0.637–0.761] | 9 / 15 | B |
| Forming, baking and cooking | 0.671 [0.604–0.745] | 1 / 1 | D |
| Fermentation | 0.696 [0.601–0.814] | 1 / 1 | D |
| Slaughter, cutting and primary processing | 0.686 [0.613–0.771] | 1 / 1 | D |
| Whole plant or unspecified | 0.663 [0.588–0.738] | 4 / 4 | C |

